본문으로 건너뛰기

레슨 9/10 · 16단어 · 외운 단어 0

Drawings and specifications

도면과 시방서

  1. 1

    floor plan(noun)

    /flɔːr plæn/

    평면도, 층평면도

    a drawing that shows the layout of one floor of a building from above, with walls, doors, windows and rooms

    The typical floor plan shows eight apartments around a central core.

    기준층 평면도에는 중앙 코어를 둘러싸고 아파트 8세대가 배치되어 있습니다.

    Mark the new partition on the floor plan and send it to the architect.

    유의어blueprintlayoutplandiagram
    반의어none
  2. 2

    scale(noun)

    /skeɪl/

    축척, 스케일

    the ratio between the size of something on a drawing and its real size, such as 1:100

    This floor plan is drawn at a scale of 1:100.

    이 평면도는 1:100 축척으로 그려져 있다.

    Never measure from a drawing that is not to scale; use the written dimensions.

  3. 3

    revision(noun)

    /rɪˈvɪʒn/

    수정, 수정 요청, 리비전

    a change made to a piece of work after feedback, often limited to a set number of rounds

    The agency fee includes two rounds of revisions for each design.

    대행 수수료에는 디자인별 두 차례의 수정이 포함되어 있다.

    The client asked for a revision to the logo colour.

  4. 4

    shop drawing(noun)

    /ˈʃɒp ˌdrɔːɪŋ/

    시공도, 제작 도면

    a detailed drawing made by the contractor or supplier showing exactly how equipment will be built or installed

    The panel builder must submit shop drawings for approval before manufacture.

    패널 제작업체는 제작 전에 승인을 위해 시공도를 제출해야 한다.

    The consultant returned the shop drawings with several comments.

  5. 5

    as-built drawing(noun)

    /ˌæz ˈbɪlt ˌdrɔːɪŋ/

    준공도, 준공 도면

    a final drawing updated to show exactly how the installation was actually completed

    Mark every cable route change so we can prepare accurate as-built drawings.

    정확한 준공도를 작성할 수 있도록 케이블 경로가 바뀐 곳은 모두 표시하십시오.

    The client will not sign off until the as-built drawings are delivered.

  6. 6

    site plan(noun)

    /ˈsaɪt ˌplæn/

    배치도

    a drawing that shows the whole site from above, including buildings, roads, boundaries and connections to services

    The site plan shows where the new car park and gate will be.

    배치도에는 새 주차장과 출입문이 들어설 위치가 표시되어 있다.

    Attach the approved site plan to the building permit application.

  7. 7

    elevation(noun)

    /ˌelɪˈveɪʃn/

    입면도

    a drawing that shows one outside face of a building as seen straight from the front, side or back

    The north elevation shows the position of all windows and balconies.

    북측 입면도에는 모든 창문과 발코니의 위치가 나와 있다.

    The client asked for changes to the colours on the main elevation.

  8. 8

    section(noun)

    /ˈsekʃn/

    단면도

    a drawing that shows a building as if it were cut vertically, showing floor heights, levels and how parts fit together

    The section through the stairs shows the headroom at each landing.

    계단 단면도에는 각 층계참의 머리 높이가 나와 있다.

    Check the ceiling heights on the building section before ordering ducts.

  9. 9

    detail drawing(noun)

    /ˈdiːteɪl ˌdrɔːɪŋ/

    상세도

    a large-scale drawing that shows exactly how a small part of a building is made or connected

    The detail drawing shows how the waterproofing turns up at the wall.

    상세도에는 방수층이 벽체에서 어떻게 올려 시공되는지 나와 있다.

    We are waiting for the detail drawing of the handrail fixing.

  10. 10

    gridline(noun)

    /ˈɡrɪdlaɪn/

    기준 축선, 그리드 라인

    one of the reference lines, marked with letters and numbers, used on drawings and on site to locate columns and walls

    The crack is on the slab between gridlines 3 and 4.

    균열은 3번과 4번 기준 축선 사이의 슬래브에 있다.

    All columns are set out from the gridlines on the structural drawings.

  11. 11

    structural drawing(noun)

    /ˈstrʌktʃərəl ˌdrɔːɪŋ/

    구조 도면, 구조도

    a drawing prepared by the structural engineer showing the sizes, reinforcement and positions of the load-carrying parts

    The beam sizes on the structural drawing do not match the architectural layout.

    구조 도면의 보 크기가 건축 평면과 일치하지 않는다.

    Steel fixers work directly from the structural drawings.

  12. 12

    specification(noun)

    /ˌspesɪfɪˈkeɪʃn/

    시방서

    a written document that describes the materials, standards and quality of work required for a construction project

    The specification requires all paint to be low in harmful chemicals.

    시방서에는 모든 페인트가 유해 화학물질 함량이 낮아야 한다고 규정되어 있다.

    If the drawing and the specification disagree, ask the consultant which one applies.

  13. 13

    BIM(abbreviation)

    /bɪm/

    건축정보모델링, BIM

    building information modelling: creating and sharing a detailed 3D digital model of a building with all its information

    The contractor uses BIM to check quantities and plan the work sequence.

    시공사는 BIM을 이용해 물량을 확인하고 작업 순서를 계획한다.

    Our BIM coordinator updates the model after every design change.

  14. 14

    clash detection(noun)

    /ˈklæʃ dɪˌtekʃn/

    간섭 검토, 간섭 체크

    the process of using a 3D model to find places where pipes, ducts, beams or other elements would hit each other

    Clash detection found 200 places where ducts hit the beams.

    간섭 검토 결과 덕트가 보와 충돌하는 곳이 200군데 발견되었다.

    We run clash detection every week during MEP coordination.

  15. 15

    RFI(abbreviation)

    /ˌɑːr ef ˈaɪ/

    정보 요청서, 질의서, RFI

    request for information: a formal written question from the contractor to the designer when drawings are unclear or missing

    We raised an RFI because the beam level is missing from the section.

    단면도에 보 레벨이 빠져 있어서 RFI를 제출했다.

    The architect must respond to each RFI within seven days.

  16. 16

    submittal(noun)

    /səbˈmɪtl/

    제출물, 승인용 제출서류, 서브미탈

    a document, sample or drawing sent by the contractor to the consultant for approval before using a material or method

    The tile submittal included samples and test certificates.

    타일 제출물에는 견본과 시험성적서가 포함되어 있었다.

    Late submittals are delaying the ordering of the lifts.