본문으로 건너뛰기

레슨 8/10 · 15단어 · 외운 단어 0

Finishing works and building services

마감 공사와 건축 설비

  1. 1

    plaster(noun)

    /ˈplæstər/

    미장, 미장 모르타르, 플라스터

    a mixture of cement or gypsum, sand and water spread on walls and ceilings to give a smooth surface

    The plaster on the external walls is fifteen millimetres thick.

    외벽 미장 두께는 15mm입니다.

    Wait until the plaster is completely dry before painting.

    유의어castdressingstuccomortar
    반의어none
  2. 2

    cladding(noun)

    /ˈklædɪŋ/

    외장재, 외벽 마감재, 클래딩

    an outer layer of material, such as metal panels or stone, fixed to the walls of a building for protection and appearance

    The aluminium cladding must meet the fire safety rules.

    알루미늄 외장재는 화재 안전 규정을 충족해야 한다.

    Cladding installation on the east facade starts next week.

    유의어coveringsheathingfacingsiding
    반의어bareexposeduncovered
  3. 3

    joinery(noun)

    /ˈdʒɔɪnəri/

    목공사, 창호 및 목재 조작물, 조작 가구

    the wooden parts of a building made by skilled workers, such as doors, windows, stairs and built-in cupboards

    The joinery for the hotel rooms is made in a factory in Binh Duong.

    호텔 객실용 목공 제품은 빈즈엉에 있는 공장에서 제작됩니다.

    Joinery should be installed after the wet trades are finished.

    유의어woodworkcarpentrycabinetmaking
    반의어metalworkmasonry
  4. 4

    partition(noun)

    /pɑːrˈtɪʃn/

    칸막이, 칸막이벽, 경량 칸막이

    a non-structural wall that divides the space inside a building into rooms

    Glass partitions separate the meeting rooms from the open office.

    유리 칸막이가 회의실과 개방형 사무실을 구분하고 있다.

    The tenant wants to move some partitions after handover.

    유의어divisionseparationsegmentationsplit
    반의어unionjoiningmergerintegration
  5. 5

    plumbing(noun)

    /ˈplʌmɪŋ/

    배관, 급배수 설비, 위생설비

    the system of pipes, tanks and fittings that supplies water to a building and takes waste water away

    Plumbing pipes in the toilets must be pressure tested before tiling.

    화장실의 배관은 타일 시공 전에 압력 시험을 해야 한다.

    The plumbing subcontractor installed the water tanks on the roof.

    유의어pipeworkpipeswaterworks
    반의어none
  6. 6

    sprinkler system(noun)

    /ˈsprɪŋklər ˈsɪstəm/

    스프링클러 설비, 스프링클러 시스템

    a fire protection system of pipes and heads in the ceiling that sprays water automatically when it detects heat

    The sprinkler system must be approved by the fire police before occupancy.

    스프링클러 설비는 입주 전에 소방서의 승인을 받아야 합니다.

    Move the sprinkler heads to match the new ceiling layout.

    유의어fire suppression systemautomatic sprinkler
    반의어none
  7. 7

    screed(noun)

    /skriːd/

    바닥 모르타르, 바닥 미장

    a thin level layer of sand and cement laid on a concrete slab to make a smooth base for floor finishes

    The screed must be level before the tiles are laid.

    타일을 붙이기 전에 바닥 모르타르가 수평이어야 한다.

    A fifty-millimetre screed covers the underfloor pipes in the ground floor kitchen.

  8. 8

    skim coat(noun)

    /ˈskɪm ˌkəʊt/

    퍼티 마감층, 스킴코트

    a very thin final layer of plaster or putty applied to a wall to make it smooth before painting

    Two skim coats of putty are needed before the paint is applied.

    페인트를 칠하기 전에 퍼티를 두 번 얇게 발라야 한다.

    The skim coat cracked because the plaster underneath was still wet.

  9. 9

    suspended ceiling(noun)

    /səˌspendɪd ˈsiːlɪŋ/

    시스템 천장, 달대 천장

    a ceiling hung below the structural slab on a metal frame, leaving a space above it for pipes, ducts and cables

    The suspended ceiling in the office hides the air-conditioning ducts.

    사무실의 시스템 천장 안에 공조 덕트가 숨겨져 있다.

    Leave access panels in the suspended ceiling for maintenance.

  10. 10

    curtain wall(noun)

    /ˈkɜːtn ˌwɔːl/

    커튼월

    a thin outer wall of glass and metal frames hung on a building's structure, carrying only its own weight

    The office tower has a full-height glass curtain wall.

    이 오피스 타워는 층고 전체 높이의 유리 커튼월로 되어 있다.

    The curtain wall subcontractor tested the panels for water leaks.

  11. 11

    fit-out(noun)

    /ˈfɪt aʊt/

    인테리어 공사, 내부 마감 공사

    the work of finishing the inside of a building and adding fittings and furniture so it is ready to use

    The tenant will start the office fit-out after the shell is handed over.

    임차인은 건물 본체가 인도된 후 사무실 인테리어 공사를 시작할 것이다.

    The fit-out contractor is installing the reception desk and partitions.

  12. 12

    MEP(abbreviation)

    /ˌem iː ˈpiː/

    기계·전기·배관 설비, 기전설비, MEP

    mechanical, electrical and plumbing: the building services systems such as air conditioning, power, water and drainage

    MEP coordination drawings must be approved before the ceilings are closed.

    천장을 마감하기 전에 MEP 조정 도면이 승인되어야 한다.

    The MEP contractor is installing the cable trays on level six.

  13. 13

    HVAC(abbreviation)

    /ˌeɪtʃ viː eɪ ˈsiː/

    냉난방 공조 설비, 공조설비, HVAC

    heating, ventilation and air conditioning: the systems that control temperature and fresh air in a building

    The HVAC ducts take up most of the ceiling space in the corridor.

    HVAC 덕트가 복도 천장 공간의 대부분을 차지한다.

    HVAC testing and balancing will be done before handover.

  14. 14

    service riser(noun)

    /ˈsɜːvɪs ˌraɪzə(r)/

    설비 샤프트, 파이프 샤프트

    a vertical shaft running through the floors of a building that holds pipes, ducts and cables

    All main water pipes run through the service riser next to the lift.

    모든 주 급수관은 엘리베이터 옆의 설비 샤프트를 통과한다.

    The service riser must be fire-sealed at every floor.

  15. 15

    pipe sleeve(noun)

    /ˈpaɪp ˌsliːv/

    배관 슬리브, 슬리브

    a short tube cast into a wall or slab so that a pipe can pass through it later

    Pipe sleeves must be fixed in the formwork before the slab is poured.

    슬래브를 타설하기 전에 거푸집에 배관 슬리브를 고정해야 한다.

    A missing pipe sleeve meant the team had to core drill the beam.