Finishing works and building services

  1. 1

    plaster(noun)

    /ˈplæstər/

    a mixture of cement or gypsum, sand and water spread on walls and ceilings to give a smooth surface

    The plaster on the external walls is fifteen millimetres thick.

    Wait until the plaster is completely dry before painting.

    Synonymscastdressingstuccomortar
    Antonymsnone
  2. 2

    cladding(noun)

    /ˈklædɪŋ/

    an outer layer of material, such as metal panels or stone, fixed to the walls of a building for protection and appearance

    The aluminium cladding must meet the fire safety rules.

    Cladding installation on the east facade starts next week.

    Synonymscoveringsheathingfacingsiding
    Antonymsbareexposeduncovered
  3. 3

    joinery(noun)

    /ˈdʒɔɪnəri/

    the wooden parts of a building made by skilled workers, such as doors, windows, stairs and built-in cupboards

    The joinery for the hotel rooms is made in a factory in Binh Duong.

    Joinery should be installed after the wet trades are finished.

    Synonymswoodworkcarpentrycabinetmaking
    Antonymsmetalworkmasonry
  4. 4

    partition(noun)

    /pɑːrˈtɪʃn/

    a non-structural wall that divides the space inside a building into rooms

    Glass partitions separate the meeting rooms from the open office.

    The tenant wants to move some partitions after handover.

    Synonymsdivisionseparationsegmentationsplit
    Antonymsunionjoiningmergerintegration
  5. 5

    plumbing(noun)

    /ˈplʌmɪŋ/

    the system of pipes, tanks and fittings that supplies water to a building and takes waste water away

    Plumbing pipes in the toilets must be pressure tested before tiling.

    The plumbing subcontractor installed the water tanks on the roof.

    Synonymspipeworkpipeswaterworks
    Antonymsnone
  6. 6

    sprinkler system(noun)

    /ˈsprɪŋklər ˈsɪstəm/

    a fire protection system of pipes and heads in the ceiling that sprays water automatically when it detects heat

    The sprinkler system must be approved by the fire police before occupancy.

    Move the sprinkler heads to match the new ceiling layout.

    Synonymsfire suppression systemautomatic sprinkler
    Antonymsnone
  7. 7

    screed(noun)

    /skriːd/

    a thin level layer of sand and cement laid on a concrete slab to make a smooth base for floor finishes

    The screed must be level before the tiles are laid.

    A fifty-millimetre screed covers the underfloor pipes in the ground floor kitchen.

  8. 8

    skim coat(noun)

    /ˈskɪm ˌkəʊt/

    a very thin final layer of plaster or putty applied to a wall to make it smooth before painting

    Two skim coats of putty are needed before the paint is applied.

    The skim coat cracked because the plaster underneath was still wet.

  9. 9

    suspended ceiling(noun)

    /səˌspendɪd ˈsiːlɪŋ/

    a ceiling hung below the structural slab on a metal frame, leaving a space above it for pipes, ducts and cables

    The suspended ceiling in the office hides the air-conditioning ducts.

    Leave access panels in the suspended ceiling for maintenance.

  10. 10

    curtain wall(noun)

    /ˈkɜːtn ˌwɔːl/

    a thin outer wall of glass and metal frames hung on a building's structure, carrying only its own weight

    The office tower has a full-height glass curtain wall.

    The curtain wall subcontractor tested the panels for water leaks.

  11. 11

    fit-out(noun)

    /ˈfɪt aʊt/

    the work of finishing the inside of a building and adding fittings and furniture so it is ready to use

    The tenant will start the office fit-out after the shell is handed over.

    The fit-out contractor is installing the reception desk and partitions.

  12. 12

    MEP(abbreviation)

    /ˌem iː ˈpiː/

    mechanical, electrical and plumbing: the building services systems such as air conditioning, power, water and drainage

    MEP coordination drawings must be approved before the ceilings are closed.

    The MEP contractor is installing the cable trays on level six.

  13. 13

    HVAC(abbreviation)

    /ˌeɪtʃ viː eɪ ˈsiː/

    heating, ventilation and air conditioning: the systems that control temperature and fresh air in a building

    The HVAC ducts take up most of the ceiling space in the corridor.

    HVAC testing and balancing will be done before handover.

  14. 14

    service riser(noun)

    /ˈsɜːvɪs ˌraɪzə(r)/

    a vertical shaft running through the floors of a building that holds pipes, ducts and cables

    All main water pipes run through the service riser next to the lift.

    The service riser must be fire-sealed at every floor.

  15. 15

    pipe sleeve(noun)

    /ˈpaɪp ˌsliːv/

    a short tube cast into a wall or slab so that a pipe can pass through it later

    Pipe sleeves must be fixed in the formwork before the slab is poured.

    A missing pipe sleeve meant the team had to core drill the beam.