Finishing works and building services
Pekerjaan finishing dan sistem utilitas bangunan
plesteran, plester
a mixture of cement or gypsum, sand and water spread on walls and ceilings to give a smooth surface
The plaster on the external walls is fifteen millimetres thick.
Plesteran pada dinding luar setebal lima belas milimeter.
Wait until the plaster is completely dry before painting.
SinonimcastdressingstuccomortarAntonimnonepelapis dinding luar, panel fasad
an outer layer of material, such as metal panels or stone, fixed to the walls of a building for protection and appearance
The aluminium cladding must meet the fire safety rules.
Pelapis aluminium harus memenuhi ketentuan keselamatan kebakaran.
Cladding installation on the east facade starts next week.
SinonimcoveringsheathingfacingsidingAntonimbareexposeduncoveredpekerjaan kayu, joinery, kusen dan mebel kayu
the wooden parts of a building made by skilled workers, such as doors, windows, stairs and built-in cupboards
The joinery for the hotel rooms is made in a factory in Binh Duong.
Pekerjaan kayu untuk kamar-kamar hotel dibuat di sebuah pabrik di Binh Duong.
Joinery should be installed after the wet trades are finished.
SinonimwoodworkcarpentrycabinetmakingAntonimmetalworkmasonrypartisi, dinding pembatas, sekat
a non-structural wall that divides the space inside a building into rooms
Glass partitions separate the meeting rooms from the open office.
Partisi kaca memisahkan ruang rapat dari kantor terbuka.
The tenant wants to move some partitions after handover.
SinonimdivisionseparationsegmentationsplitAntonimunionjoiningmergerintegrationplumbing, instalasi perpipaan, sistem pemipaan
the system of pipes, tanks and fittings that supplies water to a building and takes waste water away
Plumbing pipes in the toilets must be pressure tested before tiling.
Pipa instalasi air di toilet harus diuji tekanan sebelum pemasangan keramik.
The plumbing subcontractor installed the water tanks on the roof.
SinonimpipeworkpipeswaterworksAntonimnonesistem sprinkler, sistem pemadam kebakaran otomatis
a fire protection system of pipes and heads in the ceiling that sprays water automatically when it detects heat
The sprinkler system must be approved by the fire police before occupancy.
Sistem sprinkler harus disetujui oleh dinas pemadam kebakaran sebelum gedung dihuni.
Move the sprinkler heads to match the new ceiling layout.
Sinonimfire suppression systemautomatic sprinklerAntonimnonescreed, adukan perata lantai, acian lantai
a thin level layer of sand and cement laid on a concrete slab to make a smooth base for floor finishes
The screed must be level before the tiles are laid.
Screed harus rata sebelum keramik dipasang.
A fifty-millimetre screed covers the underfloor pipes in the ground floor kitchen.
plamir, lapisan plamir
a very thin final layer of plaster or putty applied to a wall to make it smooth before painting
Two skim coats of putty are needed before the paint is applied.
Dua lapis plamir diperlukan sebelum cat diaplikasikan.
The skim coat cracked because the plaster underneath was still wet.
plafon gantung, langit-langit gantung
a ceiling hung below the structural slab on a metal frame, leaving a space above it for pipes, ducts and cables
The suspended ceiling in the office hides the air-conditioning ducts.
Plafon gantung di kantor itu menyembunyikan saluran pendingin udara.
Leave access panels in the suspended ceiling for maintenance.
dinding tirai, curtain wall
a thin outer wall of glass and metal frames hung on a building's structure, carrying only its own weight
The office tower has a full-height glass curtain wall.
Gedung perkantoran itu memiliki dinding tirai kaca setinggi penuh.
The curtain wall subcontractor tested the panels for water leaks.
fit-out, pekerjaan interior, finishing interior
the work of finishing the inside of a building and adding fittings and furniture so it is ready to use
The tenant will start the office fit-out after the shell is handed over.
Penyewa akan memulai fit-out kantor setelah struktur bangunan (shell) diserahterimakan.
The fit-out contractor is installing the reception desk and partitions.
MEP, mekanikal elektrikal dan plambing
mechanical, electrical and plumbing: the building services systems such as air conditioning, power, water and drainage
MEP coordination drawings must be approved before the ceilings are closed.
Gambar koordinasi MEP harus disetujui sebelum plafon ditutup.
The MEP contractor is installing the cable trays on level six.
HVAC, tata udara, sistem pemanas, ventilasi, dan pendingin udara
heating, ventilation and air conditioning: the systems that control temperature and fresh air in a building
The HVAC ducts take up most of the ceiling space in the corridor.
Saluran udara HVAC memakan sebagian besar ruang plafon di koridor.
HVAC testing and balancing will be done before handover.
shaft utilitas, poros utilitas vertikal
a vertical shaft running through the floors of a building that holds pipes, ducts and cables
All main water pipes run through the service riser next to the lift.
Semua pipa air utama melewati shaft utilitas di sebelah lift.
The service riser must be fire-sealed at every floor.
sleeve pipa, selongsong pipa
a short tube cast into a wall or slab so that a pipe can pass through it later
Pipe sleeves must be fixed in the formwork before the slab is poured.
Sleeve pipa harus dipasang pada bekisting sebelum pelat dicor.
A missing pipe sleeve meant the team had to core drill the beam.