Foundations and earthworks
Cimentaciones y movimiento de tierras
compactación
the process of pressing soil or other fill so that it becomes denser and stronger
The compaction test showed that the fill reached 95 percent density.
La prueba de compactación mostró que el relleno alcanzó el 95 por ciento de densidad.
Poor compaction under the slab caused cracks after one year.
SinónimoscompressionconsolidationdensificationpackingAntónimosexpansionlooseningdilationacuerdo transaccional, transacción, arreglo
an official agreement that ends a dispute or lawsuit, often with one party paying money to the other
The parties reached a settlement just before the trial began.
Las partes llegaron a un acuerdo transaccional justo antes de que comenzara el juicio.
Under the settlement agreement, the company will pay five hundred million dong.
limpieza del terreno, despeje del sitio
the removal of trees, old buildings, rubbish and topsoil from a site before construction starts
Site clearance took three weeks because of the old warehouse foundations.
La limpieza del terreno tomó tres semanas debido a las cimentaciones del antiguo almacén.
The site clearance contract includes removing all tree roots.
replanteo, trazado y nivelación
the process of marking the exact positions and levels of a building on the ground from the drawings
Setting out of the gridlines was checked by the supervision consultant.
El replanteo de los ejes de la cuadrícula fue verificado por la consultora supervisora.
An error in the setting out moved the whole building thirty centimetres.
excavación
the digging and removal of soil to make space for foundations, basements or pipes; also the hole made
The basement excavation reached the final level twelve metres below ground.
La excavación del sótano alcanzó el nivel final, doce metros bajo el nivel del suelo.
Rainwater must be pumped out of the excavation before casting the blinding.
relleno, material de relleno
soil or other material used to fill the space around foundations, walls or pipes after they are built
Backfill must be placed in layers no thicker than thirty centimetres.
El relleno debe colocarse en capas de no más de treinta centímetros de espesor.
We used sand as backfill around the drainage pipes.
estudio de suelos, investigación geotécnica
tests carried out on the ground of a site to find the type and strength of the soil before foundations are designed
The soil investigation found soft clay down to twenty metres.
El estudio de suelos encontró arcilla blanda hasta los veinte metros.
Pile lengths will be decided after the soil investigation report is issued.
sondeo, perforación geotécnica
a deep narrow hole drilled into the ground to take soil samples and study the layers below
Five boreholes were drilled across the site to a depth of forty metres.
Se perforaron cinco sondeos en el terreno hasta una profundidad de cuarenta metros.
The borehole log shows a layer of sand at fifteen metres.
capacidad portante, capacidad de carga
the maximum load per unit area that the ground can safely support without failing or settling too much
The bearing capacity of the topsoil is too low for shallow foundations.
La capacidad portante de la capa superficial del suelo es demasiado baja para cimentaciones superficiales.
A plate load test was done to confirm the bearing capacity.
abatimiento del nivel freático, drenaje de excavación
the removal of groundwater from an excavation, using pumps or wells, so that work can be done in dry conditions
Dewatering must continue until the basement slab is cast.
El abatimiento del nivel freático debe continuar hasta que se cuele la losa del sótano.
Neighbours complained that dewatering caused cracks in their houses.
cimentación con pilotes, cimentación profunda
a deep foundation made of long columns driven or cast into the ground to carry loads down to strong soil or rock
Because the soil is soft, the tower needs a pile foundation.
Como el suelo es blando, la torre requiere una cimentación con pilotes.
The pile foundation works are planned to finish by the end of March.
pilote perforado, pilote colado in situ
a pile made by drilling a hole in the ground, placing a steel cage inside and filling it with concrete
The building sits on 120 bored piles of one metre diameter.
El edificio se apoya en 120 pilotes perforados de un metro de diámetro.
Concrete for each bored pile must be poured without stopping.
cabezal de pilotes, dado de cimentación
a thick concrete block built on top of a group of piles to spread the load from a column to the piles
The pile cap under the core is almost three metres thick.
El cabezal de pilotes bajo el núcleo tiene casi tres metros de espesor.
Cut the pile heads to the correct level before building the pile cap.
prueba de carga de pilotes
a test in which a heavy load is placed on a finished pile to check that it can carry its design load safely
Two test piles failed the pile load test, so the design was changed.
Dos pilotes de prueba no pasaron la prueba de carga de pilotes, por lo que se modificó el diseño.
Production piling cannot start until the pile load test results are approved.
zapata aislada
a square or rectangular block of concrete under a single column that spreads its load onto the ground
Each column of the warehouse rests on a pad footing two metres square.
Cada columna del almacén descansa sobre una zapata aislada de dos metros por lado.
The pad footings were made larger after the soil test results.
losa de cimentación, cimentación por losa
a large thick concrete slab under the whole building that spreads the total load over a wide area of ground
The raft foundation was poured in one continuous operation over 30 hours.
La losa de cimentación se coló en una sola operación continua de 30 horas.
A raft foundation was chosen because the loads are high and the soil is weak.