Foundations and earthworks

Pundasyon at paghuhukay at paglilipat ng lupa

  1. 1

    compaction(noun)

    kəm´pækʃən

    kompaksyon, pagsiksik ng lupa

    the process of pressing soil or other fill so that it becomes denser and stronger

    The compaction test showed that the fill reached 95 percent density.

    Ipinakita ng compaction test na umabot sa 95 porsiyentong densidad ang tambak.

    Poor compaction under the slab caused cracks after one year.

    Kasingkahulugancompressionconsolidationdensificationpacking
    Kasalungatexpansionlooseningdilation
  2. 2

    settlement(noun)

    /ˈsetlmənt/

    areglo, kasunduan sa pag-areglo

    an official agreement that ends a dispute or lawsuit, often with one party paying money to the other

    The parties reached a settlement just before the trial began.

    Nagkaroon ng areglo ang mga partido bago magsimula ang paglilitis.

    Under the settlement agreement, the company will pay five hundred million dong.

  3. 3

    site clearance(noun)

    /ˈsaɪt ˌklɪərəns/

    paghahawan ng lugar, paglilinis ng lote

    the removal of trees, old buildings, rubbish and topsoil from a site before construction starts

    Site clearance took three weeks because of the old warehouse foundations.

    Tatlong linggo ang inabot ng paghahawan ng lugar dahil sa mga lumang pundasyon ng bodega.

    The site clearance contract includes removing all tree roots.

  4. 4

    setting out(noun)

    /ˌsetɪŋ ˈaʊt/

    paglalatag ng sukat, pagmamarka ng posisyon

    the process of marking the exact positions and levels of a building on the ground from the drawings

    Setting out of the gridlines was checked by the supervision consultant.

    Sinuri ng consultant na tagapangasiwa ang paglalatag ng sukat ng mga gridline.

    An error in the setting out moved the whole building thirty centimetres.

  5. 5

    excavation(noun)

    /ˌekskəˈveɪʃn/

    paghuhukay, hukay

    the digging and removal of soil to make space for foundations, basements or pipes; also the hole made

    The basement excavation reached the final level twelve metres below ground.

    Narating na ng paghuhukay para sa basement ang pinal na antas nito, labindalawang metro sa ilalim ng lupa.

    Rainwater must be pumped out of the excavation before casting the blinding.

  6. 6

    backfill(noun)

    /ˈbækfɪl/

    pantambak, pantabon na lupa

    soil or other material used to fill the space around foundations, walls or pipes after they are built

    Backfill must be placed in layers no thicker than thirty centimetres.

    Ang pantambak ay dapat ilatag nang patong-patong na hindi lalampas sa tatlumpung sentimetro ang kapal.

    We used sand as backfill around the drainage pipes.

  7. 7

    soil investigation(noun)

    /ˈsɔɪl ɪnˌvestɪˌɡeɪʃn/

    pagsisiyasat ng lupa, pagsusuri sa lupa

    tests carried out on the ground of a site to find the type and strength of the soil before foundations are designed

    The soil investigation found soft clay down to twenty metres.

    Natuklasan sa pagsisiyasat ng lupa ang malambot na putik hanggang dalawampung metro ang lalim.

    Pile lengths will be decided after the soil investigation report is issued.

  8. 8

    borehole(noun)

    /ˈbɔːhəʊl/

    butas na binarena, butas na pansuri ng lupa

    a deep narrow hole drilled into the ground to take soil samples and study the layers below

    Five boreholes were drilled across the site to a depth of forty metres.

    Limang butas na binarena ang ginawa sa buong lugar, hanggang apatnapung metro ang lalim.

    The borehole log shows a layer of sand at fifteen metres.

  9. 9

    bearing capacity(noun)

    /ˈbeərɪŋ kəˌpæsəti/

    kapasidad ng pagdadala ng lupa, lakas ng pagsuporta ng lupa

    the maximum load per unit area that the ground can safely support without failing or settling too much

    The bearing capacity of the topsoil is too low for shallow foundations.

    Masyadong mababa ang kapasidad ng pagdadala ng pang-ibabaw na lupa para sa mababaw na pundasyon.

    A plate load test was done to confirm the bearing capacity.

  10. 10

    dewatering(noun)

    /diːˈwɔːtərɪŋ/

    pag-aalis ng tubig sa hukay, pagpapatuyo ng hukay

    the removal of groundwater from an excavation, using pumps or wells, so that work can be done in dry conditions

    Dewatering must continue until the basement slab is cast.

    Dapat magpatuloy ang pag-aalis ng tubig sa hukay hanggang mabuhos ang slab ng basement.

    Neighbours complained that dewatering caused cracks in their houses.

  11. 11

    pile foundation(noun)

    /ˈpaɪl faʊnˌdeɪʃn/

    pundasyong pilote, pundasyong may tulos

    a deep foundation made of long columns driven or cast into the ground to carry loads down to strong soil or rock

    Because the soil is soft, the tower needs a pile foundation.

    Dahil malambot ang lupa, kailangan ng tore ng pundasyong pilote.

    The pile foundation works are planned to finish by the end of March.

  12. 12

    bored pile(noun)

    /ˌbɔːd ˈpaɪl/

    binarenang pilote, tulos na binarena

    a pile made by drilling a hole in the ground, placing a steel cage inside and filling it with concrete

    The building sits on 120 bored piles of one metre diameter.

    Nakatayo ang gusali sa 120 binarenang pilote na may diyametrong isang metro.

    Concrete for each bored pile must be poured without stopping.

  13. 13

    pile cap(noun)

    /ˈpaɪl ˌkæp/

    takip ng pilote, pantakip sa mga pilote

    a thick concrete block built on top of a group of piles to spread the load from a column to the piles

    The pile cap under the core is almost three metres thick.

    Halos tatlong metro ang kapal ng takip ng pilote sa ilalim ng core.

    Cut the pile heads to the correct level before building the pile cap.

  14. 14

    pile load test(noun)

    /ˈpaɪl ˈləʊd ˌtest/

    pagsubok sa karga ng pilote, pagsusuri ng bigat sa pilote

    a test in which a heavy load is placed on a finished pile to check that it can carry its design load safely

    Two test piles failed the pile load test, so the design was changed.

    Dalawang test pile ang bumagsak sa pagsubok sa karga ng pilote, kaya binago ang disenyo.

    Production piling cannot start until the pile load test results are approved.

  15. 15

    pad footing(noun)

    /ˈpæd ˌfʊtɪŋ/

    sapata ng haligi, hiwalay na sapata

    a square or rectangular block of concrete under a single column that spreads its load onto the ground

    Each column of the warehouse rests on a pad footing two metres square.

    Ang bawat haligi ng bodega ay nakapatong sa sapata ng haligi na dalawang metro kuwadrado.

    The pad footings were made larger after the soil test results.

  16. 16

    raft foundation(noun)

    /ˈrɑːft faʊnˌdeɪʃn/

    pundasyong balsa, pundasyong lapat

    a large thick concrete slab under the whole building that spreads the total load over a wide area of ground

    The raft foundation was poured in one continuous operation over 30 hours.

    Ibinuhos ang pundasyong balsa sa iisang tuloy-tuloy na operasyon na tumagal nang 30 oras.

    A raft foundation was chosen because the loads are high and the soil is weak.