الدرس 5/10 · 16 كلمة · تم تعلّم 0
Foundations and earthworks
الأساسات والأعمال الترابية
دمك, رصّ
the process of pressing soil or other fill so that it becomes denser and stronger
The compaction test showed that the fill reached 95 percent density.
أظهر اختبار الدمك أن الردم بلغ كثافة 95 بالمئة.
Poor compaction under the slab caused cracks after one year.
المرادفاتcompressionconsolidationdensificationpackingالأضدادexpansionlooseningdilationتسوية, تسوية ودية, صلح
an official agreement that ends a dispute or lawsuit, often with one party paying money to the other
The parties reached a settlement just before the trial began.
توصل الطرفان إلى تسوية قبل بدء المحاكمة مباشرة.
Under the settlement agreement, the company will pay five hundred million dong.
تنظيف الموقع, تجهيز الموقع وإزالة العوائق
the removal of trees, old buildings, rubbish and topsoil from a site before construction starts
Site clearance took three weeks because of the old warehouse foundations.
استغرق تنظيف الموقع ثلاثة أسابيع بسبب أساسات المستودع القديم.
The site clearance contract includes removing all tree roots.
التوقيع المساحي, أعمال التوقيع
the process of marking the exact positions and levels of a building on the ground from the drawings
Setting out of the gridlines was checked by the supervision consultant.
تحقق الاستشاري المشرف من توقيع خطوط الشبكة.
An error in the setting out moved the whole building thirty centimetres.
الحفر, أعمال الحفر, الحفرية
the digging and removal of soil to make space for foundations, basements or pipes; also the hole made
The basement excavation reached the final level twelve metres below ground.
وصل حفر القبو إلى المنسوب النهائي على عمق اثني عشر مترًا تحت سطح الأرض.
Rainwater must be pumped out of the excavation before casting the blinding.
الردم, مواد الردم
soil or other material used to fill the space around foundations, walls or pipes after they are built
Backfill must be placed in layers no thicker than thirty centimetres.
يجب فرش الردم على طبقات لا يزيد سمك الواحدة منها على ثلاثين سنتيمترًا.
We used sand as backfill around the drainage pipes.
فحص التربة, الاستكشاف الجيوتقني
tests carried out on the ground of a site to find the type and strength of the soil before foundations are designed
The soil investigation found soft clay down to twenty metres.
كشف فحص التربة عن وجود طين رخو حتى عمق عشرين مترًا.
Pile lengths will be decided after the soil investigation report is issued.
حفرة استكشافية, جسّة تربة
a deep narrow hole drilled into the ground to take soil samples and study the layers below
Five boreholes were drilled across the site to a depth of forty metres.
حُفرت خمس حفر استكشافية في أنحاء الموقع حتى عمق أربعين مترًا.
The borehole log shows a layer of sand at fifteen metres.
قدرة تحمّل التربة, تحمّل التربة
the maximum load per unit area that the ground can safely support without failing or settling too much
The bearing capacity of the topsoil is too low for shallow foundations.
قدرة تحمل التربة السطحية منخفضة جدًا للأساسات الضحلة.
A plate load test was done to confirm the bearing capacity.
نزح المياه الجوفية, خفض منسوب المياه الجوفية
the removal of groundwater from an excavation, using pumps or wells, so that work can be done in dry conditions
Dewatering must continue until the basement slab is cast.
يجب استمرار نزح المياه الجوفية حتى صب بلاطة القبو.
Neighbours complained that dewatering caused cracks in their houses.
الأساس الخازوقي, أساس على خوازيق
a deep foundation made of long columns driven or cast into the ground to carry loads down to strong soil or rock
Because the soil is soft, the tower needs a pile foundation.
بما أن التربة رخوة، يحتاج البرج إلى أساس خازوقي.
The pile foundation works are planned to finish by the end of March.
خازوق محفور, خازوق مصبوب في الموقع
a pile made by drilling a hole in the ground, placing a steel cage inside and filling it with concrete
The building sits on 120 bored piles of one metre diameter.
يرتكز المبنى على 120 خازوقًا محفورًا قطر كل منها متر واحد.
Concrete for each bored pile must be poured without stopping.
غطاء الخوازيق
a thick concrete block built on top of a group of piles to spread the load from a column to the piles
The pile cap under the core is almost three metres thick.
يبلغ سمك غطاء الخوازيق أسفل النواة نحو ثلاثة أمتار.
Cut the pile heads to the correct level before building the pile cap.
اختبار تحميل الخازوق, اختبار تحميل الخوازيق
a test in which a heavy load is placed on a finished pile to check that it can carry its design load safely
Two test piles failed the pile load test, so the design was changed.
فشل خازوقان تجريبيان في اختبار تحميل الخازوق، فتم تغيير التصميم.
Production piling cannot start until the pile load test results are approved.
قاعدة منفردة, أساس منفصل
a square or rectangular block of concrete under a single column that spreads its load onto the ground
Each column of the warehouse rests on a pad footing two metres square.
يرتكز كل عمود في المستودع على قاعدة منفردة مساحتها مترين في مترين.
The pad footings were made larger after the soil test results.
الأساس الحصيري, اللبشة الخرسانية
a large thick concrete slab under the whole building that spreads the total load over a wide area of ground
The raft foundation was poured in one continuous operation over 30 hours.
صُبَّ الأساس الحصيري في عملية واحدة متواصلة استمرت 30 ساعة.
A raft foundation was chosen because the loads are high and the soil is weak.
