Foundations and earthworks
Temeller ve toprak işleri
sıkıştırma, kompaksiyon
the process of pressing soil or other fill so that it becomes denser and stronger
The compaction test showed that the fill reached 95 percent density.
Sıkıştırma deneyi, dolgunun yüzde 95 yoğunluğa ulaştığını gösterdi.
Poor compaction under the slab caused cracks after one year.
Eş anlamlılarcompressionconsolidationdensificationpackingZıt anlamlılarexpansionlooseningdilationsulh, uzlaşma, sulh anlaşması
an official agreement that ends a dispute or lawsuit, often with one party paying money to the other
The parties reached a settlement just before the trial began.
Taraflar, duruşma başlamadan hemen önce sulh oldu.
Under the settlement agreement, the company will pay five hundred million dong.
saha temizliği, arazi hazırlığı, hafriyat öncesi temizlik
the removal of trees, old buildings, rubbish and topsoil from a site before construction starts
Site clearance took three weeks because of the old warehouse foundations.
Eski depo temelleri nedeniyle saha temizliği üç hafta sürdü.
The site clearance contract includes removing all tree roots.
aplikasyon, yer tespiti, kazık çakma ve aks işaretleme
the process of marking the exact positions and levels of a building on the ground from the drawings
Setting out of the gridlines was checked by the supervision consultant.
Aks çizgilerinin aplikasyonu denetim danışmanı tarafından kontrol edildi.
An error in the setting out moved the whole building thirty centimetres.
kazı, hafriyat, temel çukuru
the digging and removal of soil to make space for foundations, basements or pipes; also the hole made
The basement excavation reached the final level twelve metres below ground.
Bodrum kazısı zemin seviyesinin on iki metre altındaki nihai kotuna ulaştı.
Rainwater must be pumped out of the excavation before casting the blinding.
geri dolgu, dolgu malzemesi
soil or other material used to fill the space around foundations, walls or pipes after they are built
Backfill must be placed in layers no thicker than thirty centimetres.
Geri dolgu, kalınlığı otuz santimetreyi geçmeyen tabakalar halinde serilmelidir.
We used sand as backfill around the drainage pipes.
zemin etüdü, zemin araştırması, zemin incelemesi
tests carried out on the ground of a site to find the type and strength of the soil before foundations are designed
The soil investigation found soft clay down to twenty metres.
Zemin etüdü yirmi metreye kadar yumuşak kil tespit etti.
Pile lengths will be decided after the soil investigation report is issued.
sondaj kuyusu, sondaj deliği
a deep narrow hole drilled into the ground to take soil samples and study the layers below
Five boreholes were drilled across the site to a depth of forty metres.
Sahanın çeşitli noktalarında kırk metre derinliğe kadar beş sondaj kuyusu açıldı.
The borehole log shows a layer of sand at fifteen metres.
taşıma gücü, zemin taşıma gücü
the maximum load per unit area that the ground can safely support without failing or settling too much
The bearing capacity of the topsoil is too low for shallow foundations.
Bitkisel toprak tabakasının taşıma gücü, yüzeysel temeller için çok düşüktür.
A plate load test was done to confirm the bearing capacity.
drenaj, yeraltı suyu seviyesinin düşürülmesi, su tahliyesi
the removal of groundwater from an excavation, using pumps or wells, so that work can be done in dry conditions
Dewatering must continue until the basement slab is cast.
Su seviyesi düşürme işlemi, bodrum radyesi dökülene kadar sürdürülmelidir.
Neighbours complained that dewatering caused cracks in their houses.
kazıklı temel
a deep foundation made of long columns driven or cast into the ground to carry loads down to strong soil or rock
Because the soil is soft, the tower needs a pile foundation.
Zemin yumuşak olduğu için kulenin kazıklı temele ihtiyacı var.
The pile foundation works are planned to finish by the end of March.
fore kazık, delme kazık
a pile made by drilling a hole in the ground, placing a steel cage inside and filling it with concrete
The building sits on 120 bored piles of one metre diameter.
Bina, bir metre çapında 120 adet fore kazık üzerine oturmaktadır.
Concrete for each bored pile must be poured without stopping.
kazık başlığı, kazık başlık kirişi
a thick concrete block built on top of a group of piles to spread the load from a column to the piles
The pile cap under the core is almost three metres thick.
Çekirdeğin altındaki kazık başlığının kalınlığı yaklaşık üç metredir.
Cut the pile heads to the correct level before building the pile cap.
kazık yükleme deneyi, kazık yük deneyi
a test in which a heavy load is placed on a finished pile to check that it can carry its design load safely
Two test piles failed the pile load test, so the design was changed.
İki deney kazığı kazık yükleme deneyinde başarısız oldu, bu nedenle proje değiştirildi.
Production piling cannot start until the pile load test results are approved.
tekil temel, münferit temel
a square or rectangular block of concrete under a single column that spreads its load onto the ground
Each column of the warehouse rests on a pad footing two metres square.
Deponun her kolonu, iki metreye iki metre ölçülerinde bir tekil temel üzerine oturmaktadır.
The pad footings were made larger after the soil test results.
radye temel, radye
a large thick concrete slab under the whole building that spreads the total load over a wide area of ground
The raft foundation was poured in one continuous operation over 30 hours.
Radye temel, 30 saat boyunca kesintisiz tek seferde döküldü.
A raft foundation was chosen because the loads are high and the soil is weak.