Pular para o conteúdo

Lição 5/10 · 16 palavras · 0 aprendidas

Foundations and earthworks

Fundações e terraplenagem

  1. 1

    compaction(noun)

    kəm´pækʃən

    compactação

    the process of pressing soil or other fill so that it becomes denser and stronger

    The compaction test showed that the fill reached 95 percent density.

    O ensaio de compactação mostrou que o aterro atingiu 95 por cento de densidade.

    Poor compaction under the slab caused cracks after one year.

    Sinônimoscompressionconsolidationdensificationpacking
    Antônimosexpansionlooseningdilation
  2. 2

    settlement(noun)

    /ˈsetlmənt/

    acordo, transação

    an official agreement that ends a dispute or lawsuit, often with one party paying money to the other

    The parties reached a settlement just before the trial began.

    As partes chegaram a um acordo pouco antes do início do julgamento.

    Under the settlement agreement, the company will pay five hundred million dong.

  3. 3

    site clearance(noun)

    /ˈsaɪt ˌklɪərəns/

    limpeza do terreno, desmatamento e destocamento

    the removal of trees, old buildings, rubbish and topsoil from a site before construction starts

    Site clearance took three weeks because of the old warehouse foundations.

    A limpeza do terreno levou três semanas por causa das fundações do antigo galpão.

    The site clearance contract includes removing all tree roots.

  4. 4

    setting out(noun)

    /ˌsetɪŋ ˈaʊt/

    locação da obra, marcação topográfica

    the process of marking the exact positions and levels of a building on the ground from the drawings

    Setting out of the gridlines was checked by the supervision consultant.

    A locação dos eixos foi conferida pela consultoria de fiscalização.

    An error in the setting out moved the whole building thirty centimetres.

  5. 5

    excavation(noun)

    /ˌekskəˈveɪʃn/

    escavação

    the digging and removal of soil to make space for foundations, basements or pipes; also the hole made

    The basement excavation reached the final level twelve metres below ground.

    A escavação do subsolo atingiu o nível final, doze metros abaixo do solo.

    Rainwater must be pumped out of the excavation before casting the blinding.

  6. 6

    backfill(noun)

    /ˈbækfɪl/

    reaterro, material de aterro

    soil or other material used to fill the space around foundations, walls or pipes after they are built

    Backfill must be placed in layers no thicker than thirty centimetres.

    O reaterro deve ser executado em camadas de no máximo trinta centímetros.

    We used sand as backfill around the drainage pipes.

  7. 7

    soil investigation(noun)

    /ˈsɔɪl ɪnˌvestɪˌɡeɪʃn/

    investigação geotécnica, sondagem do solo

    tests carried out on the ground of a site to find the type and strength of the soil before foundations are designed

    The soil investigation found soft clay down to twenty metres.

    A investigação geotécnica encontrou argila mole até vinte metros de profundidade.

    Pile lengths will be decided after the soil investigation report is issued.

  8. 8

    borehole(noun)

    /ˈbɔːhəʊl/

    furo de sondagem, sondagem

    a deep narrow hole drilled into the ground to take soil samples and study the layers below

    Five boreholes were drilled across the site to a depth of forty metres.

    Foram executados cinco furos de sondagem no terreno, até quarenta metros de profundidade.

    The borehole log shows a layer of sand at fifteen metres.

  9. 9

    bearing capacity(noun)

    /ˈbeərɪŋ kəˌpæsəti/

    capacidade de carga, capacidade de suporte do solo

    the maximum load per unit area that the ground can safely support without failing or settling too much

    The bearing capacity of the topsoil is too low for shallow foundations.

    A capacidade de carga da camada superficial do solo é baixa demais para fundações rasas.

    A plate load test was done to confirm the bearing capacity.

  10. 10

    dewatering(noun)

    /diːˈwɔːtərɪŋ/

    rebaixamento do lençol freático, esgotamento

    the removal of groundwater from an excavation, using pumps or wells, so that work can be done in dry conditions

    Dewatering must continue until the basement slab is cast.

    O rebaixamento do lençol freático deve continuar até a concretagem da laje do subsolo.

    Neighbours complained that dewatering caused cracks in their houses.

  11. 11

    pile foundation(noun)

    /ˈpaɪl faʊnˌdeɪʃn/

    fundação em estacas, fundação profunda

    a deep foundation made of long columns driven or cast into the ground to carry loads down to strong soil or rock

    Because the soil is soft, the tower needs a pile foundation.

    Como o solo é mole, a torre precisa de fundação em estacas.

    The pile foundation works are planned to finish by the end of March.

  12. 12

    bored pile(noun)

    /ˌbɔːd ˈpaɪl/

    estaca escavada, estaca broca

    a pile made by drilling a hole in the ground, placing a steel cage inside and filling it with concrete

    The building sits on 120 bored piles of one metre diameter.

    O edifício está apoiado em 120 estacas escavadas de um metro de diâmetro.

    Concrete for each bored pile must be poured without stopping.

  13. 13

    pile cap(noun)

    /ˈpaɪl ˌkæp/

    bloco de coroamento, bloco sobre estacas

    a thick concrete block built on top of a group of piles to spread the load from a column to the piles

    The pile cap under the core is almost three metres thick.

    O bloco de coroamento sob o núcleo tem quase três metros de espessura.

    Cut the pile heads to the correct level before building the pile cap.

  14. 14

    pile load test(noun)

    /ˈpaɪl ˈləʊd ˌtest/

    prova de carga em estaca, ensaio de carregamento estático

    a test in which a heavy load is placed on a finished pile to check that it can carry its design load safely

    Two test piles failed the pile load test, so the design was changed.

    Duas estacas de teste foram reprovadas na prova de carga, então o projeto foi alterado.

    Production piling cannot start until the pile load test results are approved.

  15. 15

    pad footing(noun)

    /ˈpæd ˌfʊtɪŋ/

    sapata isolada

    a square or rectangular block of concrete under a single column that spreads its load onto the ground

    Each column of the warehouse rests on a pad footing two metres square.

    Cada pilar do galpão apoia-se em uma sapata isolada de dois metros por dois metros.

    The pad footings were made larger after the soil test results.

  16. 16

    raft foundation(noun)

    /ˈrɑːft faʊnˌdeɪʃn/

    radier, fundação em radier

    a large thick concrete slab under the whole building that spreads the total load over a wide area of ground

    The raft foundation was poured in one continuous operation over 30 hours.

    O radier foi concretado em uma operação contínua de 30 horas.

    A raft foundation was chosen because the loads are high and the soil is weak.