Concrete and reinforcement

Hormigón y armadura

  1. 1

    ready-mixed concrete(noun)

    /ˌredi mɪkst ˈkɒŋkriːt/

    concreto premezclado, hormigón premezclado

    concrete that is mixed at a batching plant and delivered to the site in mixer trucks, ready to use

    We ordered 250 cubic metres of ready-mixed concrete for Saturday.

    Pedimos 250 metros cúbicos de concreto premezclado para el sábado.

    The ready-mixed concrete supplier must provide a delivery ticket for every truck.

  2. 2

    compressive strength(noun)

    /kəmˌpresɪv ˈstreŋθ/

    resistencia a la compresión

    the ability of concrete to resist being crushed, usually tested on samples after 7 and 28 days

    The 28-day compressive strength of the column concrete must reach 40 MPa.

    La resistencia a la compresión a 28 días del concreto de las columnas debe alcanzar 40 MPa.

    Low compressive strength results were found in two of the test cubes.

  3. 3

    slump test(noun)

    /ˈslʌmp ˌtest/

    prueba de revenimiento, ensayo de asentamiento

    a simple site test that measures how much fresh concrete sinks when a cone mould is lifted, showing its workability

    The site engineer rejected the truck because the slump test result was too high.

    El ingeniero de obra rechazó el camión porque el resultado de la prueba de revenimiento fue demasiado alto.

    Do a slump test on every truck before pumping starts.

  4. 4

    water-cement ratio(noun)

    /ˌwɔːtə sɪˈment ˌreɪʃiəʊ/

    relación agua-cemento, relación a/c

    the weight of water divided by the weight of cement in a concrete mix, which strongly affects its strength

    Adding water on site increases the water-cement ratio and weakens the concrete.

    Agregar agua en obra aumenta la relación agua-cemento y debilita el concreto.

    The mix design specifies a water-cement ratio of 0.45.

  5. 5

    admixture(noun)

    /ədˈmɪkstʃə(r)/

    aditivo, aditivo para concreto

    a chemical added to concrete in small amounts to change properties such as setting time or workability

    A retarding admixture was used because of the hot weather.

    Se utilizó un aditivo retardante debido al clima caluroso.

    The admixture dosage must follow the supplier's data sheet.

  6. 6

    formwork(noun)

    /ˈfɔːmwɜːk/

    encofrado, cimbra

    temporary moulds made of timber, plywood or steel that hold fresh concrete in shape until it hardens

    The formwork for the columns can be removed after 24 hours.

    El encofrado de las columnas se puede retirar después de 24 horas.

    Check that the formwork is clean and oiled before pouring.

  7. 7

    shoring(noun)

    /ˈʃɔːrɪŋ/

    apuntalamiento, entibado

    temporary props or frames that support formwork, slabs or excavation sides until they can support themselves

    The shoring under the transfer beam must stay for at least 28 days.

    El apuntalamiento bajo la viga de transferencia debe permanecer al menos 28 días.

    Steel shoring was installed to support the deep excavation walls.

  8. 8

    rebar(noun)

    /ˈriːbɑː(r)/

    varilla de refuerzo, acero de refuerzo, barra corrugada

    steel bars placed inside concrete to make it strong enough to resist bending and pulling forces

    The rebar for the slab arrived cut and bent from the workshop.

    El acero de refuerzo para la losa llegó cortado y doblado desde el taller.

    Rusty rebar must be cleaned before it is placed.

  9. 9

    stirrup(noun)

    /ˈstɪrəp/

    estribo

    a small closed loop of steel bar that holds the main bars of a beam or column in place and resists shear

    The stirrups near the column must be spaced at one hundred millimetres.

    Los estribos cercanos a la columna deben colocarse con una separación de cien milímetros.

    Several stirrups were missing at the beam ends, so the pour was stopped.

  10. 10

    lap splice(noun)

    /ˈlæp ˌsplaɪs/

    traslape, empalme por traslape

    the length where two reinforcement bars overlap so that force can pass from one bar to the other

    The lap splice for these bars must be at least forty times the bar diameter.

    El traslape de estas barras debe ser de al menos cuarenta veces el diámetro de la barra.

    Do not place all lap splices at the same section of the beam.

  11. 11

    concrete cover(noun)

    /ˌkɒŋkriːt ˈkʌvə(r)/

    recubrimiento, recubrimiento de concreto

    the thickness of concrete between the surface and the nearest steel bar, which protects the steel from rust and fire

    Use plastic spacers to keep a concrete cover of 25 millimetres.

    Use separadores de plástico para mantener un recubrimiento de 25 milímetros.

    Insufficient concrete cover led to rust stains on the balcony slab.

  12. 12

    bar bending schedule(noun)

    /ˌbɑː ˈbendɪŋ ˌʃedjuːl/

    planilla de despiece de acero, tabla de doblado de acero

    a table listing every reinforcement bar with its mark, size, shape, length and number, used for cutting and bending

    The detailer sent the bar bending schedule for the third floor slab.

    El detallista envió la planilla de despiece de acero de la losa del tercer piso.

    Steel was ordered from the bar bending schedule to reduce waste.

  13. 13

    pour(verb)

    /pɔː(r)/

    vaciar, colar, verter

    to place fresh concrete into formwork or a prepared area

    We plan to pour the fourth floor slab on Thursday night.

    Planeamos vaciar la losa del cuarto piso el jueves por la noche.

    Do not pour concrete in heavy rain without protection.

  14. 14

    curing(noun)

    /ˈkjʊərɪŋ/

    curado, curado del concreto

    keeping new concrete wet and at a suitable temperature for several days so that it gains full strength

    Curing must continue for at least seven days after the pour.

    El curado debe continuar al menos siete días después del vaciado.

    The slab cracked because curing started too late on a hot day.

  15. 15

    construction joint(noun)

    /kənˈstrʌkʃn ˌdʒɔɪnt/

    junta de construcción, junta fría

    a planned stopping point between two concrete pours, prepared so that the new concrete bonds well to the old

    The construction joint in the slab must be at one third of the span.

    La junta de construcción de la losa debe ubicarse a un tercio de la luz.

    Clean and wet the construction joint before the next pour.

  16. 16

    honeycombing(noun)

    /ˈhʌnikəʊmɪŋ/

    cangrejera, hormigueo, nido de piedra

    a defect where the concrete surface has holes and exposed stones because it was not compacted properly

    Honeycombing was found at the base of three columns after the formwork was removed.

    Se encontraron cangrejeras en la base de tres columnas después de retirar el encofrado.

    Poor vibration is the main cause of honeycombing.