Aralin 6/10 · 16 salita · 0 natutunan
Concrete and reinforcement
Kongkreto at reinforcement
handang halong kongkreto, kongkretong galing sa planta
concrete that is mixed at a batching plant and delivered to the site in mixer trucks, ready to use
We ordered 250 cubic metres of ready-mixed concrete for Saturday.
Umorder kami ng 250 kubikong metro ng handang halong kongkreto para sa Sabado.
The ready-mixed concrete supplier must provide a delivery ticket for every truck.
lakas-kompresyon, lakas sa pagdiin
the ability of concrete to resist being crushed, usually tested on samples after 7 and 28 days
The 28-day compressive strength of the column concrete must reach 40 MPa.
Ang 28-araw na lakas-kompresyon ng kongkreto para sa haligi ay dapat umabot sa 40 MPa.
Low compressive strength results were found in two of the test cubes.
pagsubok ng lundo ng kongkreto, pagsusuri ng pagkalambot
a simple site test that measures how much fresh concrete sinks when a cone mould is lifted, showing its workability
The site engineer rejected the truck because the slump test result was too high.
Tinanggihan ng inhinyero ng proyekto ang trak dahil masyadong mataas ang resulta ng pagsubok ng lundo.
Do a slump test on every truck before pumping starts.
ratio ng tubig sa semento, proporsyon ng tubig at semento
the weight of water divided by the weight of cement in a concrete mix, which strongly affects its strength
Adding water on site increases the water-cement ratio and weakens the concrete.
Ang pagdaragdag ng tubig sa lugar ng proyekto ay nagpapataas ng ratio ng tubig sa semento at nagpapahina sa kongkreto.
The mix design specifies a water-cement ratio of 0.45.
karagdagang halo, kemikal na halo sa kongkreto
a chemical added to concrete in small amounts to change properties such as setting time or workability
A retarding admixture was used because of the hot weather.
Gumamit ng halong pampabagal ng pagtigas dahil sa mainit na panahon.
The admixture dosage must follow the supplier's data sheet.
porma, hulmahan ng kongkreto
temporary moulds made of timber, plywood or steel that hold fresh concrete in shape until it hardens
The formwork for the columns can be removed after 24 hours.
Maaaring alisin ang porma ng mga haligi pagkatapos ng 24 oras.
Check that the formwork is clean and oiled before pouring.
pansuporta, pansalo, pansamantalang poste
temporary props or frames that support formwork, slabs or excavation sides until they can support themselves
The shoring under the transfer beam must stay for at least 28 days.
Ang pansuporta sa ilalim ng transfer beam ay dapat manatili nang hindi bababa sa 28 araw.
Steel shoring was installed to support the deep excavation walls.
kabilya, bakal na pampatibay
steel bars placed inside concrete to make it strong enough to resist bending and pulling forces
The rebar for the slab arrived cut and bent from the workshop.
Dumating ang kabilya para sa losa na putol at baluktot na mula sa pagawaan.
Rusty rebar must be cleaned before it is placed.
estribo, pantali ng kabilya
a small closed loop of steel bar that holds the main bars of a beam or column in place and resists shear
The stirrups near the column must be spaced at one hundred millimetres.
Ang agwat ng mga estribo malapit sa haligi ay dapat isandaang milimetro.
Several stirrups were missing at the beam ends, so the pour was stopped.
traslape, pagpapatong na dugtong ng kabilya
the length where two reinforcement bars overlap so that force can pass from one bar to the other
The lap splice for these bars must be at least forty times the bar diameter.
Ang traslape ng mga bakal na ito ay dapat hindi bababa sa apatnapung beses ng diyametro ng baras.
Do not place all lap splices at the same section of the beam.
takip na kongkreto, kapal ng pantakip
the thickness of concrete between the surface and the nearest steel bar, which protects the steel from rust and fire
Use plastic spacers to keep a concrete cover of 25 millimetres.
Gumamit ng mga plastik na spacer upang mapanatili ang takip na kongkreto na 25 milimetro.
Insufficient concrete cover led to rust stains on the balcony slab.
talaan ng pagbabaluktot ng kabilya
a table listing every reinforcement bar with its mark, size, shape, length and number, used for cutting and bending
The detailer sent the bar bending schedule for the third floor slab.
Ipinadala ng detailer ang talaan ng pagbabaluktot ng kabilya para sa losa ng ikatlong palapag.
Steel was ordered from the bar bending schedule to reduce waste.
pag-aalaga ng kongkreto, pagpapanatiling basa ng kongkreto
keeping new concrete wet and at a suitable temperature for several days so that it gains full strength
Curing must continue for at least seven days after the pour.
Dapat magpatuloy ang pag-aalaga ng kongkreto nang hindi bababa sa pitong araw pagkatapos ng pagbubuhos.
The slab cracked because curing started too late on a hot day.
dugtungan ng konstruksiyon, tahi ng pagbubuhos
a planned stopping point between two concrete pours, prepared so that the new concrete bonds well to the old
The construction joint in the slab must be at one third of the span.
Ang dugtungan ng konstruksiyon sa losa ay dapat nasa isang-katlo ng haba ng agwat.
Clean and wet the construction joint before the next pour.
butas-butas na kongkreto, pagbutas-butas ng kongkreto
a defect where the concrete surface has holes and exposed stones because it was not compacted properly
Honeycombing was found at the base of three columns after the formwork was removed.
Natagpuan ang butas-butas na kongkreto sa paanan ng tatlong haligi matapos alisin ang porma.
Poor vibration is the main cause of honeycombing.
