Concrete and reinforcement

Beton ve donatı

  1. 1

    ready-mixed concrete(noun)

    /ˌredi mɪkst ˈkɒŋkriːt/

    hazır beton, transmikser betonu

    concrete that is mixed at a batching plant and delivered to the site in mixer trucks, ready to use

    We ordered 250 cubic metres of ready-mixed concrete for Saturday.

    Cumartesi günü için 250 metreküp hazır beton sipariş ettik.

    The ready-mixed concrete supplier must provide a delivery ticket for every truck.

  2. 2

    compressive strength(noun)

    /kəmˌpresɪv ˈstreŋθ/

    basınç dayanımı, beton basınç dayanımı

    the ability of concrete to resist being crushed, usually tested on samples after 7 and 28 days

    The 28-day compressive strength of the column concrete must reach 40 MPa.

    Kolon betonunun 28 günlük basınç dayanımı 40 MPa'ya ulaşmalıdır.

    Low compressive strength results were found in two of the test cubes.

  3. 3

    slump test(noun)

    /ˈslʌmp ˌtest/

    çökme deneyi, slump deneyi

    a simple site test that measures how much fresh concrete sinks when a cone mould is lifted, showing its workability

    The site engineer rejected the truck because the slump test result was too high.

    Şantiye mühendisi, çökme deneyi sonucu çok yüksek çıktığı için kamyonu reddetti.

    Do a slump test on every truck before pumping starts.

  4. 4

    water-cement ratio(noun)

    /ˌwɔːtə sɪˈment ˌreɪʃiəʊ/

    su/çimento oranı, su-çimento oranı

    the weight of water divided by the weight of cement in a concrete mix, which strongly affects its strength

    Adding water on site increases the water-cement ratio and weakens the concrete.

    Şantiyede su eklemek su/çimento oranını artırır ve betonu zayıflatır.

    The mix design specifies a water-cement ratio of 0.45.

  5. 5

    admixture(noun)

    /ədˈmɪkstʃə(r)/

    beton katkısı, kimyasal katkı

    a chemical added to concrete in small amounts to change properties such as setting time or workability

    A retarding admixture was used because of the hot weather.

    Sıcak hava nedeniyle geciktirici katkı kullanıldı.

    The admixture dosage must follow the supplier's data sheet.

  6. 6

    formwork(noun)

    /ˈfɔːmwɜːk/

    kalıp, beton kalıbı

    temporary moulds made of timber, plywood or steel that hold fresh concrete in shape until it hardens

    The formwork for the columns can be removed after 24 hours.

    Kolon kalıpları 24 saat sonra sökülebilir.

    Check that the formwork is clean and oiled before pouring.

  7. 7

    shoring(noun)

    /ˈʃɔːrɪŋ/

    iksa, payanda, geçici destek

    temporary props or frames that support formwork, slabs or excavation sides until they can support themselves

    The shoring under the transfer beam must stay for at least 28 days.

    Transfer kirişinin altındaki payandalar en az 28 gün yerinde kalmalıdır.

    Steel shoring was installed to support the deep excavation walls.

  8. 8

    rebar(noun)

    /ˈriːbɑː(r)/

    inşaat demiri, nervürlü donatı, donatı çeliği

    steel bars placed inside concrete to make it strong enough to resist bending and pulling forces

    The rebar for the slab arrived cut and bent from the workshop.

    Döşeme donatısı atölyeden kesilmiş ve bükülmüş olarak geldi.

    Rusty rebar must be cleaned before it is placed.

  9. 9

    stirrup(noun)

    /ˈstɪrəp/

    etriye

    a small closed loop of steel bar that holds the main bars of a beam or column in place and resists shear

    The stirrups near the column must be spaced at one hundred millimetres.

    Kolon yakınındaki etriyeler yüz milimetre aralıkla yerleştirilmelidir.

    Several stirrups were missing at the beam ends, so the pour was stopped.

  10. 10

    lap splice(noun)

    /ˈlæp ˌsplaɪs/

    bindirme boyu, bindirmeli ek

    the length where two reinforcement bars overlap so that force can pass from one bar to the other

    The lap splice for these bars must be at least forty times the bar diameter.

    Bu donatılar için bindirme boyu çubuk çapının en az kırk katı olmalıdır.

    Do not place all lap splices at the same section of the beam.

  11. 11

    concrete cover(noun)

    /ˌkɒŋkriːt ˈkʌvə(r)/

    paspayı, beton örtü tabakası

    the thickness of concrete between the surface and the nearest steel bar, which protects the steel from rust and fire

    Use plastic spacers to keep a concrete cover of 25 millimetres.

    25 milimetre paspayı sağlamak için plastik ayırıcılar kullanın.

    Insufficient concrete cover led to rust stains on the balcony slab.

  12. 12

    bar bending schedule(noun)

    /ˌbɑː ˈbendɪŋ ˌʃedjuːl/

    donatı metrajı, demir imalat listesi, donatı çizelgesi

    a table listing every reinforcement bar with its mark, size, shape, length and number, used for cutting and bending

    The detailer sent the bar bending schedule for the third floor slab.

    Detay çizimcisi üçüncü kat döşemesi için donatı çizelgesini gönderdi.

    Steel was ordered from the bar bending schedule to reduce waste.

  13. 13

    pour(verb)

    /pɔː(r)/

    beton dökmek, beton basmak

    to place fresh concrete into formwork or a prepared area

    We plan to pour the fourth floor slab on Thursday night.

    Dördüncü kat döşemesinin betonunu perşembe gecesi dökmeyi planlıyoruz.

    Do not pour concrete in heavy rain without protection.

  14. 14

    curing(noun)

    /ˈkjʊərɪŋ/

    beton bakımı, kür

    keeping new concrete wet and at a suitable temperature for several days so that it gains full strength

    Curing must continue for at least seven days after the pour.

    Beton dökümünden sonra kür en az yedi gün devam etmelidir.

    The slab cracked because curing started too late on a hot day.

  15. 15

    construction joint(noun)

    /kənˈstrʌkʃn ˌdʒɔɪnt/

    şantiye derzi, yapım derzi, çalışma derzi

    a planned stopping point between two concrete pours, prepared so that the new concrete bonds well to the old

    The construction joint in the slab must be at one third of the span.

    Döşemedeki çalışma derzi açıklığın üçte birinde olmalıdır.

    Clean and wet the construction joint before the next pour.

  16. 16

    honeycombing(noun)

    /ˈhʌnikəʊmɪŋ/

    segregasyon, petekleşme, beton boşluğu

    a defect where the concrete surface has holes and exposed stones because it was not compacted properly

    Honeycombing was found at the base of three columns after the formwork was removed.

    Kalıplar söküldükten sonra üç kolonun altında petekleşme tespit edildi.

    Poor vibration is the main cause of honeycombing.