Lesson 6/10 · 16 words · 0 learned
1
ready-mixed concrete(noun)
/ˌredi mɪkst ˈkɒŋkriːt/
concrete that is mixed at a batching plant and delivered to the site in mixer trucks, ready to use
We ordered 250 cubic metres of ready-mixed concrete for Saturday.
The ready-mixed concrete supplier must provide a delivery ticket for every truck.
2
compressive strength(noun)
/kəmˌpresɪv ˈstreŋθ/
the ability of concrete to resist being crushed, usually tested on samples after 7 and 28 days
The 28-day compressive strength of the column concrete must reach 40 MPa.
Low compressive strength results were found in two of the test cubes.
3
slump test(noun)
/ˈslʌmp ˌtest/
a simple site test that measures how much fresh concrete sinks when a cone mould is lifted, showing its workability
The site engineer rejected the truck because the slump test result was too high.
Do a slump test on every truck before pumping starts.
4
water-cement ratio(noun)
/ˌwɔːtə sɪˈment ˌreɪʃiəʊ/
the weight of water divided by the weight of cement in a concrete mix, which strongly affects its strength
Adding water on site increases the water-cement ratio and weakens the concrete.
The mix design specifies a water-cement ratio of 0.45.
5
admixture(noun)
/ədˈmɪkstʃə(r)/
a chemical added to concrete in small amounts to change properties such as setting time or workability
A retarding admixture was used because of the hot weather.
The admixture dosage must follow the supplier's data sheet.
6
formwork(noun)
/ˈfɔːmwɜːk/
temporary moulds made of timber, plywood or steel that hold fresh concrete in shape until it hardens
The formwork for the columns can be removed after 24 hours.
Check that the formwork is clean and oiled before pouring.
7
shoring(noun)
/ˈʃɔːrɪŋ/
temporary props or frames that support formwork, slabs or excavation sides until they can support themselves
The shoring under the transfer beam must stay for at least 28 days.
Steel shoring was installed to support the deep excavation walls.
8
rebar(noun)
/ˈriːbɑː(r)/
steel bars placed inside concrete to make it strong enough to resist bending and pulling forces
The rebar for the slab arrived cut and bent from the workshop.
Rusty rebar must be cleaned before it is placed.
9
stirrup(noun)
/ˈstɪrəp/
a small closed loop of steel bar that holds the main bars of a beam or column in place and resists shear
The stirrups near the column must be spaced at one hundred millimetres.
Several stirrups were missing at the beam ends, so the pour was stopped.
10
lap splice(noun)
/ˈlæp ˌsplaɪs/
the length where two reinforcement bars overlap so that force can pass from one bar to the other
The lap splice for these bars must be at least forty times the bar diameter.
Do not place all lap splices at the same section of the beam.
11
concrete cover(noun)
/ˌkɒŋkriːt ˈkʌvə(r)/
the thickness of concrete between the surface and the nearest steel bar, which protects the steel from rust and fire
Use plastic spacers to keep a concrete cover of 25 millimetres.
Insufficient concrete cover led to rust stains on the balcony slab.
12
bar bending schedule(noun)
/ˌbɑː ˈbendɪŋ ˌʃedjuːl/
a table listing every reinforcement bar with its mark, size, shape, length and number, used for cutting and bending
The detailer sent the bar bending schedule for the third floor slab.
Steel was ordered from the bar bending schedule to reduce waste.
13
pour(verb)
/pɔː(r)/
to place fresh concrete into formwork or a prepared area
We plan to pour the fourth floor slab on Thursday night.
Do not pour concrete in heavy rain without protection.
14
curing(noun)
/ˈkjʊərɪŋ/
keeping new concrete wet and at a suitable temperature for several days so that it gains full strength
Curing must continue for at least seven days after the pour.
The slab cracked because curing started too late on a hot day.
15
construction joint(noun)
/kənˈstrʌkʃn ˌdʒɔɪnt/
a planned stopping point between two concrete pours, prepared so that the new concrete bonds well to the old
The construction joint in the slab must be at one third of the span.
Clean and wet the construction joint before the next pour.
16
honeycombing(noun)
/ˈhʌnikəʊmɪŋ/
a defect where the concrete surface has holes and exposed stones because it was not compacted properly
Honeycombing was found at the base of three columns after the formwork was removed.
Poor vibration is the main cause of honeycombing.