पाठ 6/10 · 16 शब्द · 0 याद हो गए
Concrete and reinforcement
कंक्रीट और सरिया
रेडी-मिक्स कंक्रीट, तैयार कंक्रीट
concrete that is mixed at a batching plant and delivered to the site in mixer trucks, ready to use
We ordered 250 cubic metres of ready-mixed concrete for Saturday.
हमने शनिवार के लिए 250 घन मीटर रेडी-मिक्स कंक्रीट मँगवाई।
The ready-mixed concrete supplier must provide a delivery ticket for every truck.
संपीडन सामर्थ्य, संपीडन सामर्थ्य (कंप्रेसिव स्ट्रेंथ)
the ability of concrete to resist being crushed, usually tested on samples after 7 and 28 days
The 28-day compressive strength of the column concrete must reach 40 MPa.
स्तंभ की कंक्रीट की 28 दिन की संपीडन सामर्थ्य 40 MPa तक पहुँचनी चाहिए।
Low compressive strength results were found in two of the test cubes.
स्लंप परीक्षण, स्लंप टेस्ट
a simple site test that measures how much fresh concrete sinks when a cone mould is lifted, showing its workability
The site engineer rejected the truck because the slump test result was too high.
स्लंप परीक्षण का परिणाम बहुत अधिक आने के कारण साइट इंजीनियर ने ट्रक अस्वीकार कर दिया।
Do a slump test on every truck before pumping starts.
जल-सीमेंट अनुपात
the weight of water divided by the weight of cement in a concrete mix, which strongly affects its strength
Adding water on site increases the water-cement ratio and weakens the concrete.
साइट पर पानी मिलाने से जल-सीमेंट अनुपात बढ़ जाता है और कंक्रीट कमज़ोर हो जाती है।
The mix design specifies a water-cement ratio of 0.45.
मिश्रक, योजक पदार्थ
a chemical added to concrete in small amounts to change properties such as setting time or workability
A retarding admixture was used because of the hot weather.
गर्म मौसम के कारण विलंबकारी मिश्रक का उपयोग किया गया।
The admixture dosage must follow the supplier's data sheet.
शटरिंग, ढलाई साँचा
temporary moulds made of timber, plywood or steel that hold fresh concrete in shape until it hardens
The formwork for the columns can be removed after 24 hours.
खंभों की शटरिंग 24 घंटे बाद हटाई जा सकती है।
Check that the formwork is clean and oiled before pouring.
टेक, अस्थायी आधार-व्यवस्था
temporary props or frames that support formwork, slabs or excavation sides until they can support themselves
The shoring under the transfer beam must stay for at least 28 days.
अंतरण धरन के नीचे की टेक कम से कम 28 दिन तक लगी रहनी चाहिए।
Steel shoring was installed to support the deep excavation walls.
कड़ी, बंधनी, छल्ला
a small closed loop of steel bar that holds the main bars of a beam or column in place and resists shear
The stirrups near the column must be spaced at one hundred millimetres.
खंभे के पास की कड़ियाँ सौ मिलीमीटर की दूरी पर लगाई जानी चाहिए।
Several stirrups were missing at the beam ends, so the pour was stopped.
अतिव्यापन जोड़, लैप जोड़
the length where two reinforcement bars overlap so that force can pass from one bar to the other
The lap splice for these bars must be at least forty times the bar diameter.
इन छड़ों का लैप जोड़ छड़ के व्यास का कम से कम चालीस गुना होना चाहिए।
Do not place all lap splices at the same section of the beam.
कंक्रीट आवरण, रक्षात्मक आवरण
the thickness of concrete between the surface and the nearest steel bar, which protects the steel from rust and fire
Use plastic spacers to keep a concrete cover of 25 millimetres.
25 मिलीमीटर का कंक्रीट आवरण बनाए रखने के लिए प्लास्टिक स्पेसर का उपयोग करें।
Insufficient concrete cover led to rust stains on the balcony slab.
छड़ मोड़ सारणी, सरिया सूची
a table listing every reinforcement bar with its mark, size, shape, length and number, used for cutting and bending
The detailer sent the bar bending schedule for the third floor slab.
ड्राफ्ट्समैन ने तीसरी मंज़िल के स्लैब की छड़ मोड़ सारणी भेज दी।
Steel was ordered from the bar bending schedule to reduce waste.
तराई, संपोषण
keeping new concrete wet and at a suitable temperature for several days so that it gains full strength
Curing must continue for at least seven days after the pour.
ढलाई के बाद कम से कम सात दिन तक तराई जारी रखनी चाहिए।
The slab cracked because curing started too late on a hot day.
निर्माण जोड़, निर्माण संधि
a planned stopping point between two concrete pours, prepared so that the new concrete bonds well to the old
The construction joint in the slab must be at one third of the span.
स्लैब में निर्माण जोड़ स्पैन के एक-तिहाई भाग पर होना चाहिए।
Clean and wet the construction joint before the next pour.
मधुकोशी दोष, छत्ता दोष
a defect where the concrete surface has holes and exposed stones because it was not compacted properly
Honeycombing was found at the base of three columns after the formwork was removed.
शटरिंग हटाने के बाद तीन खंभों के आधार पर मधुकोशी दोष पाया गया।
Poor vibration is the main cause of honeycombing.
