Pelajaran 6/10 · 16 perkataan · 0 sudah dipelajari
Concrete and reinforcement
Konkrit dan tetulang
konkrit sedia campur
concrete that is mixed at a batching plant and delivered to the site in mixer trucks, ready to use
We ordered 250 cubic metres of ready-mixed concrete for Saturday.
Kami menempah 250 meter padu konkrit sedia campur untuk hari Sabtu.
The ready-mixed concrete supplier must provide a delivery ticket for every truck.
kekuatan mampatan
the ability of concrete to resist being crushed, usually tested on samples after 7 and 28 days
The 28-day compressive strength of the column concrete must reach 40 MPa.
Kekuatan mampatan konkrit tiang selepas 28 hari mesti mencapai 40 MPa.
Low compressive strength results were found in two of the test cubes.
ujian kemerosotan
a simple site test that measures how much fresh concrete sinks when a cone mould is lifted, showing its workability
The site engineer rejected the truck because the slump test result was too high.
Jurutera tapak menolak lori itu kerana keputusan ujian kemerosotan terlalu tinggi.
Do a slump test on every truck before pumping starts.
nisbah air-simen
the weight of water divided by the weight of cement in a concrete mix, which strongly affects its strength
Adding water on site increases the water-cement ratio and weakens the concrete.
Menambah air di tapak meningkatkan nisbah air-simen dan melemahkan konkrit.
The mix design specifies a water-cement ratio of 0.45.
bahan tambah, bahan tambah konkrit
a chemical added to concrete in small amounts to change properties such as setting time or workability
A retarding admixture was used because of the hot weather.
Bahan tambah pelambat digunakan kerana cuaca panas.
The admixture dosage must follow the supplier's data sheet.
acuan, kerja acuan
temporary moulds made of timber, plywood or steel that hold fresh concrete in shape until it hardens
The formwork for the columns can be removed after 24 hours.
Acuan untuk tiang-tiang itu boleh dibuka selepas 24 jam.
Check that the formwork is clean and oiled before pouring.
penopang, penopangan, sokongan sementara
temporary props or frames that support formwork, slabs or excavation sides until they can support themselves
The shoring under the transfer beam must stay for at least 28 days.
Penopang di bawah rasuk pemindah mesti kekal sekurang-kurangnya 28 hari.
Steel shoring was installed to support the deep excavation walls.
besi tetulang, bar tetulang
steel bars placed inside concrete to make it strong enough to resist bending and pulling forces
The rebar for the slab arrived cut and bent from the workshop.
Besi tetulang untuk papak tiba dalam keadaan sudah dipotong dan dibengkokkan dari bengkel.
Rusty rebar must be cleaned before it is placed.
sengkang, bar sengkang
a small closed loop of steel bar that holds the main bars of a beam or column in place and resists shear
The stirrups near the column must be spaced at one hundred millimetres.
Sengkang berhampiran tiang mesti dijarakkan pada seratus milimeter.
Several stirrups were missing at the beam ends, so the pour was stopped.
sambatan tindih, sambungan tindih
the length where two reinforcement bars overlap so that force can pass from one bar to the other
The lap splice for these bars must be at least forty times the bar diameter.
Sambatan tindih bagi bar-bar ini mestilah sekurang-kurangnya empat puluh kali diameter bar.
Do not place all lap splices at the same section of the beam.
penutup konkrit, selimut konkrit
the thickness of concrete between the surface and the nearest steel bar, which protects the steel from rust and fire
Use plastic spacers to keep a concrete cover of 25 millimetres.
Gunakan pengatur jarak plastik untuk mengekalkan penutup konkrit setebal 25 milimeter.
Insufficient concrete cover led to rust stains on the balcony slab.
jadual lenturan bar, jadual pembengkokan bar
a table listing every reinforcement bar with its mark, size, shape, length and number, used for cutting and bending
The detailer sent the bar bending schedule for the third floor slab.
Pelukis butiran telah menghantar jadual lenturan bar untuk papak tingkat tiga.
Steel was ordered from the bar bending schedule to reduce waste.
pengawetan, pengawetan konkrit
keeping new concrete wet and at a suitable temperature for several days so that it gains full strength
Curing must continue for at least seven days after the pour.
Pengawetan mesti diteruskan sekurang-kurangnya tujuh hari selepas penuangan.
The slab cracked because curing started too late on a hot day.
sambungan pembinaan
a planned stopping point between two concrete pours, prepared so that the new concrete bonds well to the old
The construction joint in the slab must be at one third of the span.
Sambungan pembinaan pada papak mestilah pada satu pertiga rentang.
Clean and wet the construction joint before the next pour.
sarang lebah, rongga sarang lebah
a defect where the concrete surface has holes and exposed stones because it was not compacted properly
Honeycombing was found at the base of three columns after the formwork was removed.
Sarang lebah ditemui pada bahagian bawah tiga batang tiang selepas acuan dibuka.
Poor vibration is the main cause of honeycombing.
