Concrete and reinforcement

Konkrit dan tetulang

  1. 1

    ready-mixed concrete(noun)

    /ˌredi mɪkst ˈkɒŋkriːt/

    konkrit sedia campur

    concrete that is mixed at a batching plant and delivered to the site in mixer trucks, ready to use

    We ordered 250 cubic metres of ready-mixed concrete for Saturday.

    Kami menempah 250 meter padu konkrit sedia campur untuk hari Sabtu.

    The ready-mixed concrete supplier must provide a delivery ticket for every truck.

  2. 2

    compressive strength(noun)

    /kəmˌpresɪv ˈstreŋθ/

    kekuatan mampatan

    the ability of concrete to resist being crushed, usually tested on samples after 7 and 28 days

    The 28-day compressive strength of the column concrete must reach 40 MPa.

    Kekuatan mampatan konkrit tiang selepas 28 hari mesti mencapai 40 MPa.

    Low compressive strength results were found in two of the test cubes.

  3. 3

    slump test(noun)

    /ˈslʌmp ˌtest/

    ujian kemerosotan

    a simple site test that measures how much fresh concrete sinks when a cone mould is lifted, showing its workability

    The site engineer rejected the truck because the slump test result was too high.

    Jurutera tapak menolak lori itu kerana keputusan ujian kemerosotan terlalu tinggi.

    Do a slump test on every truck before pumping starts.

  4. 4

    water-cement ratio(noun)

    /ˌwɔːtə sɪˈment ˌreɪʃiəʊ/

    nisbah air-simen

    the weight of water divided by the weight of cement in a concrete mix, which strongly affects its strength

    Adding water on site increases the water-cement ratio and weakens the concrete.

    Menambah air di tapak meningkatkan nisbah air-simen dan melemahkan konkrit.

    The mix design specifies a water-cement ratio of 0.45.

  5. 5

    admixture(noun)

    /ədˈmɪkstʃə(r)/

    bahan tambah, bahan tambah konkrit

    a chemical added to concrete in small amounts to change properties such as setting time or workability

    A retarding admixture was used because of the hot weather.

    Bahan tambah pelambat digunakan kerana cuaca panas.

    The admixture dosage must follow the supplier's data sheet.

  6. 6

    formwork(noun)

    /ˈfɔːmwɜːk/

    acuan, kerja acuan

    temporary moulds made of timber, plywood or steel that hold fresh concrete in shape until it hardens

    The formwork for the columns can be removed after 24 hours.

    Acuan untuk tiang-tiang itu boleh dibuka selepas 24 jam.

    Check that the formwork is clean and oiled before pouring.

  7. 7

    shoring(noun)

    /ˈʃɔːrɪŋ/

    penopang, penopangan, sokongan sementara

    temporary props or frames that support formwork, slabs or excavation sides until they can support themselves

    The shoring under the transfer beam must stay for at least 28 days.

    Penopang di bawah rasuk pemindah mesti kekal sekurang-kurangnya 28 hari.

    Steel shoring was installed to support the deep excavation walls.

  8. 8

    rebar(noun)

    /ˈriːbɑː(r)/

    besi tetulang, bar tetulang

    steel bars placed inside concrete to make it strong enough to resist bending and pulling forces

    The rebar for the slab arrived cut and bent from the workshop.

    Besi tetulang untuk papak tiba dalam keadaan sudah dipotong dan dibengkokkan dari bengkel.

    Rusty rebar must be cleaned before it is placed.

  9. 9

    stirrup(noun)

    /ˈstɪrəp/

    sengkang, bar sengkang

    a small closed loop of steel bar that holds the main bars of a beam or column in place and resists shear

    The stirrups near the column must be spaced at one hundred millimetres.

    Sengkang berhampiran tiang mesti dijarakkan pada seratus milimeter.

    Several stirrups were missing at the beam ends, so the pour was stopped.

  10. 10

    lap splice(noun)

    /ˈlæp ˌsplaɪs/

    sambatan tindih, sambungan tindih

    the length where two reinforcement bars overlap so that force can pass from one bar to the other

    The lap splice for these bars must be at least forty times the bar diameter.

    Sambatan tindih bagi bar-bar ini mestilah sekurang-kurangnya empat puluh kali diameter bar.

    Do not place all lap splices at the same section of the beam.

  11. 11

    concrete cover(noun)

    /ˌkɒŋkriːt ˈkʌvə(r)/

    penutup konkrit, selimut konkrit

    the thickness of concrete between the surface and the nearest steel bar, which protects the steel from rust and fire

    Use plastic spacers to keep a concrete cover of 25 millimetres.

    Gunakan pengatur jarak plastik untuk mengekalkan penutup konkrit setebal 25 milimeter.

    Insufficient concrete cover led to rust stains on the balcony slab.

  12. 12

    bar bending schedule(noun)

    /ˌbɑː ˈbendɪŋ ˌʃedjuːl/

    jadual lenturan bar, jadual pembengkokan bar

    a table listing every reinforcement bar with its mark, size, shape, length and number, used for cutting and bending

    The detailer sent the bar bending schedule for the third floor slab.

    Pelukis butiran telah menghantar jadual lenturan bar untuk papak tingkat tiga.

    Steel was ordered from the bar bending schedule to reduce waste.

  13. 13

    pour(verb)

    /pɔː(r)/

    menuang konkrit, menuang

    to place fresh concrete into formwork or a prepared area

    We plan to pour the fourth floor slab on Thursday night.

    Kami merancang untuk menuang konkrit papak tingkat empat pada malam Khamis.

    Do not pour concrete in heavy rain without protection.

  14. 14

    curing(noun)

    /ˈkjʊərɪŋ/

    pengawetan, pengawetan konkrit

    keeping new concrete wet and at a suitable temperature for several days so that it gains full strength

    Curing must continue for at least seven days after the pour.

    Pengawetan mesti diteruskan sekurang-kurangnya tujuh hari selepas penuangan.

    The slab cracked because curing started too late on a hot day.

  15. 15

    construction joint(noun)

    /kənˈstrʌkʃn ˌdʒɔɪnt/

    sambungan pembinaan

    a planned stopping point between two concrete pours, prepared so that the new concrete bonds well to the old

    The construction joint in the slab must be at one third of the span.

    Sambungan pembinaan pada papak mestilah pada satu pertiga rentang.

    Clean and wet the construction joint before the next pour.

  16. 16

    honeycombing(noun)

    /ˈhʌnikəʊmɪŋ/

    sarang lebah, rongga sarang lebah

    a defect where the concrete surface has holes and exposed stones because it was not compacted properly

    Honeycombing was found at the base of three columns after the formwork was removed.

    Sarang lebah ditemui pada bahagian bawah tiga batang tiang selepas acuan dibuka.

    Poor vibration is the main cause of honeycombing.