Concrete and reinforcement
混凝土與鋼筋
預拌混凝土, 預拌車混凝土
concrete that is mixed at a batching plant and delivered to the site in mixer trucks, ready to use
We ordered 250 cubic metres of ready-mixed concrete for Saturday.
我們訂了 250 立方公尺的預拌混凝土,星期六送達。
The ready-mixed concrete supplier must provide a delivery ticket for every truck.
抗壓強度
the ability of concrete to resist being crushed, usually tested on samples after 7 and 28 days
The 28-day compressive strength of the column concrete must reach 40 MPa.
柱混凝土的 28 天抗壓強度必須達到 40 MPa。
Low compressive strength results were found in two of the test cubes.
坍度試驗, 坍落度試驗
a simple site test that measures how much fresh concrete sinks when a cone mould is lifted, showing its workability
The site engineer rejected the truck because the slump test result was too high.
由於坍度試驗結果過高,現場工程師拒收了該輛車。
Do a slump test on every truck before pumping starts.
水灰比, 水膠比
the weight of water divided by the weight of cement in a concrete mix, which strongly affects its strength
Adding water on site increases the water-cement ratio and weakens the concrete.
在現場加水會提高水灰比,使混凝土強度降低。
The mix design specifies a water-cement ratio of 0.45.
搭接, 鋼筋搭接, 搭接長度
the length where two reinforcement bars overlap so that force can pass from one bar to the other
The lap splice for these bars must be at least forty times the bar diameter.
這些鋼筋的搭接長度必須至少為鋼筋直徑的四十倍。
Do not place all lap splices at the same section of the beam.
保護層, 混凝土保護層
the thickness of concrete between the surface and the nearest steel bar, which protects the steel from rust and fire
Use plastic spacers to keep a concrete cover of 25 millimetres.
請使用塑膠墊塊以維持25公釐的保護層厚度。
Insufficient concrete cover led to rust stains on the balcony slab.
鋼筋加工表, 鋼筋彎折明細表, 鋼筋表
a table listing every reinforcement bar with its mark, size, shape, length and number, used for cutting and bending
The detailer sent the bar bending schedule for the third floor slab.
鋼筋detailer已寄出三樓樓板的鋼筋加工表。
Steel was ordered from the bar bending schedule to reduce waste.
施工縫
a planned stopping point between two concrete pours, prepared so that the new concrete bonds well to the old
The construction joint in the slab must be at one third of the span.
樓板的施工縫必須設在跨度的三分之一處。
Clean and wet the construction joint before the next pour.