Concrete and reinforcement
Beton dan tulangan
beton siap pakai, beton ready mix
concrete that is mixed at a batching plant and delivered to the site in mixer trucks, ready to use
We ordered 250 cubic metres of ready-mixed concrete for Saturday.
Kami memesan 250 meter kubik beton siap pakai untuk hari Sabtu.
The ready-mixed concrete supplier must provide a delivery ticket for every truck.
kuat tekan, kuat tekan beton
the ability of concrete to resist being crushed, usually tested on samples after 7 and 28 days
The 28-day compressive strength of the column concrete must reach 40 MPa.
Kuat tekan beton kolom pada umur 28 hari harus mencapai 40 MPa.
Low compressive strength results were found in two of the test cubes.
uji slump, uji slam beton
a simple site test that measures how much fresh concrete sinks when a cone mould is lifted, showing its workability
The site engineer rejected the truck because the slump test result was too high.
Insinyur lapangan menolak truk tersebut karena hasil uji slump terlalu tinggi.
Do a slump test on every truck before pumping starts.
faktor air semen, rasio air-semen
the weight of water divided by the weight of cement in a concrete mix, which strongly affects its strength
Adding water on site increases the water-cement ratio and weakens the concrete.
Penambahan air di lokasi proyek meningkatkan faktor air semen dan melemahkan beton.
The mix design specifies a water-cement ratio of 0.45.
bahan tambah beton, aditif beton
a chemical added to concrete in small amounts to change properties such as setting time or workability
A retarding admixture was used because of the hot weather.
Bahan tambah pelambat digunakan karena cuaca panas.
The admixture dosage must follow the supplier's data sheet.
bekisting, cetakan beton
temporary moulds made of timber, plywood or steel that hold fresh concrete in shape until it hardens
The formwork for the columns can be removed after 24 hours.
Bekisting kolom dapat dibongkar setelah 24 jam.
Check that the formwork is clean and oiled before pouring.
perancah, penopang sementara, shoring
temporary props or frames that support formwork, slabs or excavation sides until they can support themselves
The shoring under the transfer beam must stay for at least 28 days.
Perancah di bawah balok transfer harus tetap terpasang minimal 28 hari.
Steel shoring was installed to support the deep excavation walls.
besi beton, tulangan baja
steel bars placed inside concrete to make it strong enough to resist bending and pulling forces
The rebar for the slab arrived cut and bent from the workshop.
Besi beton untuk pelat lantai tiba dari bengkel dalam keadaan sudah dipotong dan dibengkokkan.
Rusty rebar must be cleaned before it is placed.
sengkang, begel
a small closed loop of steel bar that holds the main bars of a beam or column in place and resists shear
The stirrups near the column must be spaced at one hundred millimetres.
Sengkang di dekat kolom harus dipasang dengan jarak seratus milimeter.
Several stirrups were missing at the beam ends, so the pour was stopped.
sambungan lewatan, panjang lewatan
the length where two reinforcement bars overlap so that force can pass from one bar to the other
The lap splice for these bars must be at least forty times the bar diameter.
Sambungan lewatan untuk tulangan ini minimal empat puluh kali diameter batang.
Do not place all lap splices at the same section of the beam.
selimut beton
the thickness of concrete between the surface and the nearest steel bar, which protects the steel from rust and fire
Use plastic spacers to keep a concrete cover of 25 millimetres.
Gunakan beton decking plastik untuk menjaga selimut beton setebal 25 milimeter.
Insufficient concrete cover led to rust stains on the balcony slab.
daftar pembengkokan tulangan, tabel penulangan
a table listing every reinforcement bar with its mark, size, shape, length and number, used for cutting and bending
The detailer sent the bar bending schedule for the third floor slab.
Detailer mengirimkan daftar pembengkokan tulangan untuk pelat lantai tiga.
Steel was ordered from the bar bending schedule to reduce waste.
perawatan beton
keeping new concrete wet and at a suitable temperature for several days so that it gains full strength
Curing must continue for at least seven days after the pour.
Perawatan beton harus dilanjutkan minimal tujuh hari setelah pengecoran.
The slab cracked because curing started too late on a hot day.
sambungan konstruksi, siar pelaksanaan
a planned stopping point between two concrete pours, prepared so that the new concrete bonds well to the old
The construction joint in the slab must be at one third of the span.
Sambungan konstruksi pada pelat lantai harus berada di sepertiga bentang.
Clean and wet the construction joint before the next pour.
keropos beton, sarang lebah
a defect where the concrete surface has holes and exposed stones because it was not compacted properly
Honeycombing was found at the base of three columns after the formwork was removed.
Ditemukan keropos beton di dasar tiga kolom setelah bekisting dibongkar.
Poor vibration is the main cause of honeycombing.