Contracts, acceptance and handover

Contratos, recepción y entrega de obra

  1. 1

    defect(noun)

    /ˈdiːfekt/

    defecto, vicio de construcción

    a fault in completed work, such as a crack, leak or wrong finish, that the contractor must repair

    The contractor must rectify any defect found during the warranty period.

    El contratista debe corregir cualquier defecto detectado durante el período de garantía.

    Water stains on the ceiling showed a defect in the roof waterproofing.

    Sinónimosflawfaultblemishimperfectionweaknesserrorfailingshortcoming
    Antónimosperfectionflawlessnesscorrectnessexcellence
  2. 2

    milestone(noun)

    /ˈmaɪlstəʊn/

    hito, hito del proyecto

    an important point or stage in a project, often used to check progress

    Finishing the beta version is the next major milestone.

    Terminar la versión beta es el próximo hito importante.

    The client pays 30 percent at each project milestone.

    Sinónimoslandmarkwatershedbenchmarkturning pointkey event
    Antónimossetbackregressionfailure
  3. 3

    tender(noun)

    /ˈtendə(r)/

    licitación, concurso de ofertas, oferta

    a formal process in which companies compete by submitting offers to supply goods or services, or the offer itself

    We won the tender to supply computers to all city schools.

    Ganamos la licitación para suministrar computadoras a todas las escuelas de la ciudad.

    The tender documents must be submitted before 5 p.m. on Friday.

  4. 4

    liquidated damages(noun)

    /ˌlɪkwɪdeɪtɪd ˈdæmɪdʒɪz/

    daños liquidados, cláusula penal

    a fixed amount agreed in the contract that one party must pay for a specific breach, such as late completion

    The contractor must pay liquidated damages of 0.1 percent for each day of delay.

    El contratista debe pagar daños liquidados del 0.1 por ciento por cada día de retraso.

    Liquidated damages save the parties from proving the actual loss in court.

  5. 5

    handover(noun)

    /ˈhændəʊvə(r)/

    entrega de funciones, traspaso de puesto

    passing your tasks, documents and information to a colleague before you leave a job

    Please prepare a handover document for your replacement before your last day.

    Por favor, prepare un documento de traspaso para su reemplazo antes de su último día.

    The handover took two weeks because he managed many client accounts.

  6. 6

    bill of quantities(noun)

    /ˌbɪl əv ˈkwɒntətiz/

    presupuesto de obra, cómputo métrico, lista de cantidades

    a document listing every item of work with its measured quantity, which contractors price when they tender

    The bill of quantities was issued with the tender drawings.

    El presupuesto de obra se entregó junto con los planos de la licitación.

    Our quantity surveyor found missing items in the bill of quantities.

  7. 7

    cost estimate(noun)

    /ˈkɒst ˌestɪmət/

    estimación de costos, presupuesto estimado, cálculo de costos

    a calculation of how much a construction project or part of it is likely to cost

    The preliminary cost estimate for the factory is 80 billion dong.

    La estimación preliminar de costos de la fábrica es de 80 mil millones de dongs.

    The cost estimate must be updated after the design changes.

  8. 8

    unit rate(noun)

    /ˈjuːnɪt ˌreɪt/

    precio unitario, tarifa unitaria

    the price for one unit of an item of work, such as one cubic metre of concrete, including labour, materials and plant

    The unit rate for plastering includes scaffolding and cleaning.

    El precio unitario del revoque incluye el andamiaje y la limpieza.

    New work is valued using the unit rates in the contract.

  9. 9

    variation order(noun)

    /ˌveəriˈeɪʃn ˌɔːdə(r)/

    orden de cambio, orden de variación, orden de modificación

    a written instruction from the client that changes the work in the contract, often changing the price or time

    The extra basement level was added by a variation order.

    El nivel adicional de sótano se añadió mediante una orden de cambio.

    Do not start any extra work without a signed variation order.

  10. 10

    progress payment(noun)

    /ˈprəʊɡres ˌpeɪmənt/

    pago por avance de obra, pago parcial, estimación de obra

    a payment made to the contractor at regular stages, based on the value of the work completed so far

    The contractor submits a claim for the progress payment at the end of each month.

    El contratista presenta la solicitud del pago por avance de obra a fin de cada mes.

    The progress payment was delayed because the measurements were not agreed.

  11. 11

    retention money(noun)

    /rɪˈtenʃn ˌmʌni/

    retención de garantía, fondo de garantía, retenciones

    a percentage of each payment kept back by the client until the contractor has fixed all defects

    Five percent of each payment is held as retention money.

    Se retiene el cinco por ciento de cada pago como retención de garantía.

    Half of the retention money is released at handover.

  12. 12

    extension of time(noun)

    /ɪkˌstenʃn əv ˈtaɪm/

    ampliación de plazo, prórroga de plazo, extensión de plazo

    extra time added to the contract completion date because of delays the contractor is not responsible for

    We claimed an extension of time because of the late design changes.

    Solicitamos una ampliación de plazo debido a los cambios tardíos en el diseño.

    Three weeks of extension of time were granted for the flooding.

  13. 13

    critical path(noun)

    /ˌkrɪtɪkl ˈpɑːθ/

    ruta crítica

    the longest chain of linked activities in a schedule, where any delay will delay the completion of the whole project

    The basement works are on the critical path, so they cannot slip.

    Los trabajos del sótano están en la ruta crítica, por lo que no pueden retrasarse.

    Late delivery of the lifts has moved them onto the critical path.

  14. 14

    acceptance(noun)

    /əkˈseptəns/

    recepción de obra, aceptación de trabajos, aprobación

    the formal check and approval of completed work by the client or consultant, confirming that it meets the contract

    The acceptance of the foundation works was signed by all parties.

    La recepción de los trabajos de cimentación fue firmada por todas las partes.

    Request acceptance of the rebar before you close the formwork.

  15. 15

    non-conformance report(noun)

    /ˌnɒn kənˈfɔːməns rɪˌpɔːt/

    informe de no conformidad, reporte de no conformidad (NCR)

    a formal record that some work or material does not meet the drawings or specification and must be corrected

    The consultant issued a non-conformance report for the wrong concrete grade.

    El consultor emitió un informe de no conformidad por el grado de concreto incorrecto.

    Every non-conformance report must be closed before the final inspection.

  16. 16

    punch list(noun)

    /ˈpʌntʃ ˌlɪst/

    lista de pendientes, lista de observaciones, punch list

    a list of small unfinished items and defects that must be completed before the project is fully accepted

    The punch list for the lobby has forty items, mostly paint touch-ups.

    La lista de pendientes del vestíbulo tiene cuarenta puntos, en su mayoría retoques de pintura.

    We walked through each apartment with the client to make the punch list.

  17. 17

    practical completion(noun)

    /ˌpræktɪkl kəmˈpliːʃn/

    terminación sustancial, terminación práctica, culminación sustancial

    the stage when the works are finished enough for the client to use the building, with only minor items left

    Practical completion is planned for the end of June.

    La terminación sustancial está prevista para fines de junio.

    The defects liability period starts from the date of practical completion.

  18. 18

    defects liability period(noun)

    /dɪˌfekts laɪəˈbɪləti ˌpɪəriəd/

    período de garantía, período de responsabilidad por defectos

    a fixed period after completion, often one or two years, when the contractor must repair any defects that appear

    The defects liability period for this project is twenty-four months.

    El período de garantía de este proyecto es de veinticuatro meses.

    A pipe leaked during the defects liability period, so the contractor repaired it free of charge.

  19. 19

    final account(noun)

    /ˌfaɪnl əˈkaʊnt/

    liquidación final, cuenta final, finiquito de obra

    the agreed final statement of the total contract value, including all variations and deductions, at the end of a project

    It took six months to agree the final account with the subcontractor.

    Se tardó seis meses en acordar la liquidación final con el subcontratista.

    All variations must be included in the final account.