Contracts, acceptance and handover

العقود والاستلام والتسليم

  1. 1

    defect(noun)

    /ˈdiːfekt/

    عيب, خلل

    a fault in completed work, such as a crack, leak or wrong finish, that the contractor must repair

    The contractor must rectify any defect found during the warranty period.

    يجب على المقاول إصلاح أي عيب يظهر خلال فترة الضمان.

    Water stains on the ceiling showed a defect in the roof waterproofing.

    المرادفاتflawfaultblemishimperfectionweaknesserrorfailingshortcoming
    الأضدادperfectionflawlessnesscorrectnessexcellence
  2. 2

    milestone(noun)

    /ˈmaɪlstəʊn/

    مرحلة رئيسية, معلم رئيسي, نقطة إنجاز

    an important point or stage in a project, often used to check progress

    Finishing the beta version is the next major milestone.

    يمثل الانتهاء من النسخة التجريبية المرحلة الرئيسية التالية.

    The client pays 30 percent at each project milestone.

    المرادفاتlandmarkwatershedbenchmarkturning pointkey event
    الأضدادsetbackregressionfailure
  3. 3

    tender(noun)

    /ˈtendə(r)/

    مناقصة, عطاء

    a formal process in which companies compete by submitting offers to supply goods or services, or the offer itself

    We won the tender to supply computers to all city schools.

    فزنا بالمناقصة لتوريد أجهزة حاسوب لجميع مدارس المدينة.

    The tender documents must be submitted before 5 p.m. on Friday.

  4. 4

    liquidated damages(noun)

    /ˌlɪkwɪdeɪtɪd ˈdæmɪdʒɪz/

    التعويض الاتفاقي, الشرط الجزائي

    a fixed amount agreed in the contract that one party must pay for a specific breach, such as late completion

    The contractor must pay liquidated damages of 0.1 percent for each day of delay.

    يجب على المقاول دفع تعويض اتفاقي قدره 0.1 بالمائة عن كل يوم تأخير.

    Liquidated damages save the parties from proving the actual loss in court.

  5. 5

    handover(noun)

    /ˈhændəʊvə(r)/

    تسليم المهام, تسليم واستلام العمل

    passing your tasks, documents and information to a colleague before you leave a job

    Please prepare a handover document for your replacement before your last day.

    يرجى إعداد مستند تسليم لمن سيحل محلك قبل يومك الأخير.

    The handover took two weeks because he managed many client accounts.

  6. 6

    bill of quantities(noun)

    /ˌbɪl əv ˈkwɒntətiz/

    جدول الكميات

    a document listing every item of work with its measured quantity, which contractors price when they tender

    The bill of quantities was issued with the tender drawings.

    صدر جدول الكميات مع مخططات المناقصة.

    Our quantity surveyor found missing items in the bill of quantities.

  7. 7

    cost estimate(noun)

    /ˈkɒst ˌestɪmət/

    تقدير التكاليف, تقدير التكلفة

    a calculation of how much a construction project or part of it is likely to cost

    The preliminary cost estimate for the factory is 80 billion dong.

    التقدير الأولي لتكلفة المصنع هو 80 مليار دونغ.

    The cost estimate must be updated after the design changes.

  8. 8

    unit rate(noun)

    /ˈjuːnɪt ˌreɪt/

    سعر الوحدة, السعر الإفرادي

    the price for one unit of an item of work, such as one cubic metre of concrete, including labour, materials and plant

    The unit rate for plastering includes scaffolding and cleaning.

    يشمل سعر الوحدة لأعمال اللياسة السقالات والتنظيف.

    New work is valued using the unit rates in the contract.

  9. 9

    variation order(noun)

    /ˌveəriˈeɪʃn ˌɔːdə(r)/

    أمر تغيير, أمر تعديل

    a written instruction from the client that changes the work in the contract, often changing the price or time

    The extra basement level was added by a variation order.

    أُضيف طابق السرداب الإضافي بموجب أمر تغيير.

    Do not start any extra work without a signed variation order.

  10. 10

    progress payment(noun)

    /ˈprəʊɡres ˌpeɪmənt/

    دفعة مرحلية, دفعة تحت الحساب

    a payment made to the contractor at regular stages, based on the value of the work completed so far

    The contractor submits a claim for the progress payment at the end of each month.

    يقدّم المقاول مطالبة بالدفعة المرحلية في نهاية كل شهر.

    The progress payment was delayed because the measurements were not agreed.

  11. 11

    retention money(noun)

    /rɪˈtenʃn ˌmʌni/

    مبالغ الاستبقاء, ضمان حسن التنفيذ المحتجز

    a percentage of each payment kept back by the client until the contractor has fixed all defects

    Five percent of each payment is held as retention money.

    يُحتجز خمسة بالمئة من كل دفعة كمبالغ استبقاء.

    Half of the retention money is released at handover.

  12. 12

    extension of time(noun)

    /ɪkˌstenʃn əv ˈtaɪm/

    تمديد المدة, تمديد مدة العقد

    extra time added to the contract completion date because of delays the contractor is not responsible for

    We claimed an extension of time because of the late design changes.

    طالبنا بتمديد المدة بسبب تغييرات التصميم المتأخرة.

    Three weeks of extension of time were granted for the flooding.

  13. 13

    critical path(noun)

    /ˌkrɪtɪkl ˈpɑːθ/

    المسار الحرج

    the longest chain of linked activities in a schedule, where any delay will delay the completion of the whole project

    The basement works are on the critical path, so they cannot slip.

    أعمال السرداب على المسار الحرج، لذا لا يجوز أن تتأخر.

    Late delivery of the lifts has moved them onto the critical path.

  14. 14

    acceptance(noun)

    /əkˈseptəns/

    استلام الأعمال, قبول الأعمال

    the formal check and approval of completed work by the client or consultant, confirming that it meets the contract

    The acceptance of the foundation works was signed by all parties.

    وقّع جميع الأطراف على استلام أعمال الأساسات.

    Request acceptance of the rebar before you close the formwork.

  15. 15

    non-conformance report(noun)

    /ˌnɒn kənˈfɔːməns rɪˌpɔːt/

    تقرير عدم المطابقة

    a formal record that some work or material does not meet the drawings or specification and must be corrected

    The consultant issued a non-conformance report for the wrong concrete grade.

    أصدر الاستشاري تقرير عدم مطابقة بسبب استخدام درجة خرسانة خاطئة.

    Every non-conformance report must be closed before the final inspection.

  16. 16

    punch list(noun)

    /ˈpʌntʃ ˌlɪst/

    قائمة الملاحظات, قائمة الأعمال المتبقية

    a list of small unfinished items and defects that must be completed before the project is fully accepted

    The punch list for the lobby has forty items, mostly paint touch-ups.

    تضم قائمة الملاحظات الخاصة بالردهة أربعين بندًا، معظمها ترميمات دهان.

    We walked through each apartment with the client to make the punch list.

  17. 17

    practical completion(noun)

    /ˌpræktɪkl kəmˈpliːʃn/

    الإنجاز الفعلي, الاستلام الابتدائي

    the stage when the works are finished enough for the client to use the building, with only minor items left

    Practical completion is planned for the end of June.

    من المخطط الوصول إلى الإنجاز الفعلي في نهاية يونيو.

    The defects liability period starts from the date of practical completion.

  18. 18

    defects liability period(noun)

    /dɪˌfekts laɪəˈbɪləti ˌpɪəriəd/

    فترة ضمان العيوب, فترة الصيانة

    a fixed period after completion, often one or two years, when the contractor must repair any defects that appear

    The defects liability period for this project is twenty-four months.

    فترة ضمان العيوب في هذا المشروع أربعة وعشرون شهرًا.

    A pipe leaked during the defects liability period, so the contractor repaired it free of charge.

  19. 19

    final account(noun)

    /ˌfaɪnl əˈkaʊnt/

    الحساب الختامي, المستخلص الختامي

    the agreed final statement of the total contract value, including all variations and deductions, at the end of a project

    It took six months to agree the final account with the subcontractor.

    استغرق الاتفاق على الحساب الختامي مع المقاول من الباطن ستة أشهر.

    All variations must be included in the final account.