Contracts, acceptance and handover

Contrats, réception et remise des ouvrages

  1. 1

    defect(noun)

    /ˈdiːfekt/

    défaut, malfaçon, désordre

    a fault in completed work, such as a crack, leak or wrong finish, that the contractor must repair

    The contractor must rectify any defect found during the warranty period.

    L'entrepreneur doit remédier à tout défaut constaté pendant la période de garantie.

    Water stains on the ceiling showed a defect in the roof waterproofing.

    Synonymesflawfaultblemishimperfectionweaknesserrorfailingshortcoming
    Antonymesperfectionflawlessnesscorrectnessexcellence
  2. 2

    milestone(noun)

    /ˈmaɪlstəʊn/

    jalon

    an important point or stage in a project, often used to check progress

    Finishing the beta version is the next major milestone.

    La finalisation de la version bêta est le prochain jalon majeur.

    The client pays 30 percent at each project milestone.

    Synonymeslandmarkwatershedbenchmarkturning pointkey event
    Antonymessetbackregressionfailure
  3. 3

    tender(noun)

    /ˈtendə(r)/

    appel d'offres, soumission, offre

    a formal process in which companies compete by submitting offers to supply goods or services, or the offer itself

    We won the tender to supply computers to all city schools.

    Nous avons remporté l'appel d'offres pour fournir des ordinateurs à toutes les écoles de la ville.

    The tender documents must be submitted before 5 p.m. on Friday.

  4. 4

    liquidated damages(noun)

    /ˌlɪkwɪdeɪtɪd ˈdæmɪdʒɪz/

    pénalités contractuelles, clause pénale

    a fixed amount agreed in the contract that one party must pay for a specific breach, such as late completion

    The contractor must pay liquidated damages of 0.1 percent for each day of delay.

    L'entrepreneur doit payer des pénalités de retard de 0,1 pour cent par jour de retard.

    Liquidated damages save the parties from proving the actual loss in court.

  5. 5

    handover(noun)

    /ˈhændəʊvə(r)/

    passation, passation de consignes

    passing your tasks, documents and information to a colleague before you leave a job

    Please prepare a handover document for your replacement before your last day.

    Veuillez préparer un document de passation pour votre remplaçant avant votre dernier jour.

    The handover took two weeks because he managed many client accounts.

  6. 6

    bill of quantities(noun)

    /ˌbɪl əv ˈkwɒntətiz/

    bordereau de quantités, devis quantitatif

    a document listing every item of work with its measured quantity, which contractors price when they tender

    The bill of quantities was issued with the tender drawings.

    Le bordereau de quantités a été remis avec les plans de l'appel d'offres.

    Our quantity surveyor found missing items in the bill of quantities.

  7. 7

    cost estimate(noun)

    /ˈkɒst ˌestɪmət/

    estimation des coûts, estimatif

    a calculation of how much a construction project or part of it is likely to cost

    The preliminary cost estimate for the factory is 80 billion dong.

    L'estimation préliminaire des coûts de l'usine s'élève à 80 milliards de dongs.

    The cost estimate must be updated after the design changes.

  8. 8

    unit rate(noun)

    /ˈjuːnɪt ˌreɪt/

    prix unitaire

    the price for one unit of an item of work, such as one cubic metre of concrete, including labour, materials and plant

    The unit rate for plastering includes scaffolding and cleaning.

    Le prix unitaire de l'enduit comprend l'échafaudage et le nettoyage.

    New work is valued using the unit rates in the contract.

  9. 9

    variation order(noun)

    /ˌveəriˈeɪʃn ˌɔːdə(r)/

    ordre de service modificatif, avenant

    a written instruction from the client that changes the work in the contract, often changing the price or time

    The extra basement level was added by a variation order.

    Le sous-sol supplémentaire a été ajouté par un ordre de service modificatif.

    Do not start any extra work without a signed variation order.

  10. 10

    progress payment(noun)

    /ˈprəʊɡres ˌpeɪmənt/

    acompte, situation de travaux

    a payment made to the contractor at regular stages, based on the value of the work completed so far

    The contractor submits a claim for the progress payment at the end of each month.

    L'entreprise soumet sa demande d'acompte à la fin de chaque mois.

    The progress payment was delayed because the measurements were not agreed.

  11. 11

    retention money(noun)

    /rɪˈtenʃn ˌmʌni/

    retenue de garantie

    a percentage of each payment kept back by the client until the contractor has fixed all defects

    Five percent of each payment is held as retention money.

    Cinq pour cent de chaque paiement sont conservés au titre de la retenue de garantie.

    Half of the retention money is released at handover.

  12. 12

    extension of time(noun)

    /ɪkˌstenʃn əv ˈtaɪm/

    prolongation de délai, prorogation du délai

    extra time added to the contract completion date because of delays the contractor is not responsible for

    We claimed an extension of time because of the late design changes.

    Nous avons demandé une prolongation de délai en raison des modifications tardives de la conception.

    Three weeks of extension of time were granted for the flooding.

  13. 13

    critical path(noun)

    /ˌkrɪtɪkl ˈpɑːθ/

    chemin critique

    the longest chain of linked activities in a schedule, where any delay will delay the completion of the whole project

    The basement works are on the critical path, so they cannot slip.

    Les travaux du sous-sol sont sur le chemin critique, ils ne peuvent donc pas déraper.

    Late delivery of the lifts has moved them onto the critical path.

  14. 14

    acceptance(noun)

    /əkˈseptəns/

    réception des travaux, acceptation

    the formal check and approval of completed work by the client or consultant, confirming that it meets the contract

    The acceptance of the foundation works was signed by all parties.

    La réception des travaux de fondations a été signée par toutes les parties.

    Request acceptance of the rebar before you close the formwork.

  15. 15

    non-conformance report(noun)

    /ˌnɒn kənˈfɔːməns rɪˌpɔːt/

    rapport de non-conformité, fiche de non-conformité

    a formal record that some work or material does not meet the drawings or specification and must be corrected

    The consultant issued a non-conformance report for the wrong concrete grade.

    Le consultant a émis un rapport de non-conformité pour la mauvaise classe de béton.

    Every non-conformance report must be closed before the final inspection.

  16. 16

    punch list(noun)

    /ˈpʌntʃ ˌlɪst/

    liste de réserves, liste des réserves

    a list of small unfinished items and defects that must be completed before the project is fully accepted

    The punch list for the lobby has forty items, mostly paint touch-ups.

    La liste de réserves du hall compte quarante points, surtout des retouches de peinture.

    We walked through each apartment with the client to make the punch list.

  17. 17

    practical completion(noun)

    /ˌpræktɪkl kəmˈpliːʃn/

    achèvement substantiel, réception avec réserves

    the stage when the works are finished enough for the client to use the building, with only minor items left

    Practical completion is planned for the end of June.

    L'achèvement substantiel est prévu pour fin juin.

    The defects liability period starts from the date of practical completion.

  18. 18

    defects liability period(noun)

    /dɪˌfekts laɪəˈbɪləti ˌpɪəriəd/

    délai de garantie, période de garantie de parfait achèvement

    a fixed period after completion, often one or two years, when the contractor must repair any defects that appear

    The defects liability period for this project is twenty-four months.

    Le délai de garantie de ce projet est de vingt-quatre mois.

    A pipe leaked during the defects liability period, so the contractor repaired it free of charge.

  19. 19

    final account(noun)

    /ˌfaɪnl əˈkaʊnt/

    décompte général définitif, solde du marché

    the agreed final statement of the total contract value, including all variations and deductions, at the end of a project

    It took six months to agree the final account with the subcontractor.

    Il a fallu six mois pour convenir du décompte général définitif avec le sous-traitant.

    All variations must be included in the final account.