Contracts, acceptance and handover

契約・検収・引き渡し

  1. 1

    defect(noun)

    /ˈdiːfekt/

    瑕疵, 欠陥, 不具合

    a fault in completed work, such as a crack, leak or wrong finish, that the contractor must repair

    The contractor must rectify any defect found during the warranty period.

    請負業者は、保証期間中に見つかった瑕疵をすべて是正しなければなりません。

    Water stains on the ceiling showed a defect in the roof waterproofing.

    類義語flawfaultblemishimperfectionweaknesserrorfailingshortcoming
    対義語perfectionflawlessnesscorrectnessexcellence
  2. 2

    milestone(noun)

    /ˈmaɪlstəʊn/

    マイルストーン, 節目, 中間目標

    an important point or stage in a project, often used to check progress

    Finishing the beta version is the next major milestone.

    ベータ版の完成が次の大きなマイルストーンです。

    The client pays 30 percent at each project milestone.

    類義語landmarkwatershedbenchmarkturning pointkey event
    対義語setbackregressionfailure
  3. 3

    tender(noun)

    /ˈtendə(r)/

    入札, 入札書類, 応札

    a formal process in which companies compete by submitting offers to supply goods or services, or the offer itself

    We won the tender to supply computers to all city schools.

    市内全校へのコンピューター納入の入札を落札した。

    The tender documents must be submitted before 5 p.m. on Friday.

  4. 4

    liquidated damages(noun)

    /ˌlɪkwɪdeɪtɪd ˈdæmɪdʒɪz/

    損害賠償額の予定, 違約金

    a fixed amount agreed in the contract that one party must pay for a specific breach, such as late completion

    The contractor must pay liquidated damages of 0.1 percent for each day of delay.

    請負業者は、遅延1日につき0.1パーセントの損害賠償額の予定を支払わなければならない。

    Liquidated damages save the parties from proving the actual loss in court.

  5. 5

    handover(noun)

    /ˈhændəʊvə(r)/

    引き継ぎ, 業務引継ぎ

    passing your tasks, documents and information to a colleague before you leave a job

    Please prepare a handover document for your replacement before your last day.

    最終出勤日までに、後任者のための引き継ぎ書を作成してください。

    The handover took two weeks because he managed many client accounts.

  6. 6

    bill of quantities(noun)

    /ˌbɪl əv ˈkwɒntətiz/

    工事数量書, 数量調書, BOQ

    a document listing every item of work with its measured quantity, which contractors price when they tender

    The bill of quantities was issued with the tender drawings.

    工事数量書は入札用図面とともに配布された。

    Our quantity surveyor found missing items in the bill of quantities.

  7. 7

    cost estimate(noun)

    /ˈkɒst ˌestɪmət/

    工事費見積, 概算工事費, 積算

    a calculation of how much a construction project or part of it is likely to cost

    The preliminary cost estimate for the factory is 80 billion dong.

    工場の概算工事費は800億ドンである。

    The cost estimate must be updated after the design changes.

  8. 8

    unit rate(noun)

    /ˈjuːnɪt ˌreɪt/

    単価, 工事単価

    the price for one unit of an item of work, such as one cubic metre of concrete, including labour, materials and plant

    The unit rate for plastering includes scaffolding and cleaning.

    左官工事の単価には、足場と清掃の費用が含まれている。

    New work is valued using the unit rates in the contract.

  9. 9

    variation order(noun)

    /ˌveəriˈeɪʃn ˌɔːdə(r)/

    変更指示書, 変更命令書, 設計変更指示

    a written instruction from the client that changes the work in the contract, often changing the price or time

    The extra basement level was added by a variation order.

    地下階の増設は、変更指示書によって追加された。

    Do not start any extra work without a signed variation order.

  10. 10

    progress payment(noun)

    /ˈprəʊɡres ˌpeɪmənt/

    出来高払い, 中間払い, 出来高支払

    a payment made to the contractor at regular stages, based on the value of the work completed so far

    The contractor submits a claim for the progress payment at the end of each month.

    請負業者は毎月末に出来高払いの請求書を提出する。

    The progress payment was delayed because the measurements were not agreed.

  11. 11

    retention money(noun)

    /rɪˈtenʃn ˌmʌni/

    留保金, リテンション

    a percentage of each payment kept back by the client until the contractor has fixed all defects

    Five percent of each payment is held as retention money.

    各支払額の5パーセントが留保金として保持される。

    Half of the retention money is released at handover.

  12. 12

    extension of time(noun)

    /ɪkˌstenʃn əv ˈtaɪm/

    工期延長, 工期の延長

    extra time added to the contract completion date because of delays the contractor is not responsible for

    We claimed an extension of time because of the late design changes.

    設計変更が遅れたため、工期延長を請求した。

    Three weeks of extension of time were granted for the flooding.

  13. 13

    critical path(noun)

    /ˌkrɪtɪkl ˈpɑːθ/

    クリティカルパス, 最長経路

    the longest chain of linked activities in a schedule, where any delay will delay the completion of the whole project

    The basement works are on the critical path, so they cannot slip.

    地下工事はクリティカルパス上にあるため、遅らせることはできない。

    Late delivery of the lifts has moved them onto the critical path.

  14. 14

    acceptance(noun)

    /əkˈseptəns/

    検収, 竣工検査, 出来形検査

    the formal check and approval of completed work by the client or consultant, confirming that it meets the contract

    The acceptance of the foundation works was signed by all parties.

    基礎工事の検収書には、関係者全員が署名した。

    Request acceptance of the rebar before you close the formwork.

  15. 15

    non-conformance report(noun)

    /ˌnɒn kənˈfɔːməns rɪˌpɔːt/

    不適合報告書, NCR

    a formal record that some work or material does not meet the drawings or specification and must be corrected

    The consultant issued a non-conformance report for the wrong concrete grade.

    コンサルタントは、コンクリートの強度区分の誤りについて不適合報告書を発行した。

    Every non-conformance report must be closed before the final inspection.

  16. 16

    punch list(noun)

    /ˈpʌntʃ ˌlɪst/

    パンチリスト, 手直しリスト, 是正項目一覧

    a list of small unfinished items and defects that must be completed before the project is fully accepted

    The punch list for the lobby has forty items, mostly paint touch-ups.

    ロビーのパンチリストは40項目あり、ほとんどが塗装の補修である。

    We walked through each apartment with the client to make the punch list.

  17. 17

    practical completion(noun)

    /ˌpræktɪkl kəmˈpliːʃn/

    実質的完成, 実質完了, 引渡し可能状態

    the stage when the works are finished enough for the client to use the building, with only minor items left

    Practical completion is planned for the end of June.

    実質的完成は6月末を予定している。

    The defects liability period starts from the date of practical completion.

  18. 18

    defects liability period(noun)

    /dɪˌfekts laɪəˈbɪləti ˌpɪəriəd/

    瑕疵担保期間, 欠陥責任期間, 保証期間

    a fixed period after completion, often one or two years, when the contractor must repair any defects that appear

    The defects liability period for this project is twenty-four months.

    本プロジェクトの瑕疵担保期間は24か月である。

    A pipe leaked during the defects liability period, so the contractor repaired it free of charge.

  19. 19

    final account(noun)

    /ˌfaɪnl əˈkaʊnt/

    最終精算, 最終精算書, 竣工精算

    the agreed final statement of the total contract value, including all variations and deductions, at the end of a project

    It took six months to agree the final account with the subcontractor.

    下請業者との最終精算の合意には6か月かかった。

    All variations must be included in the final account.