Contracts, acceptance and handover

Mga kontrata, pagtanggap at turnover

  1. 1

    defect(noun)

    /ˈdiːfekt/

    depekto, kapintasan

    a fault in completed work, such as a crack, leak or wrong finish, that the contractor must repair

    The contractor must rectify any defect found during the warranty period.

    Dapat ayusin ng kontratista ang anumang depektong matutuklasan sa panahon ng garantiya.

    Water stains on the ceiling showed a defect in the roof waterproofing.

    Kasingkahuluganflawfaultblemishimperfectionweaknesserrorfailingshortcoming
    Kasalungatperfectionflawlessnesscorrectnessexcellence
  2. 2

    milestone(noun)

    /ˈmaɪlstəʊn/

    milestone, mahalagang yugto

    an important point or stage in a project, often used to check progress

    Finishing the beta version is the next major milestone.

    Ang pagtatapos ng beta version ang susunod na pangunahing milestone.

    The client pays 30 percent at each project milestone.

    Kasingkahuluganlandmarkwatershedbenchmarkturning pointkey event
    Kasalungatsetbackregressionfailure
  3. 3

    tender(noun)

    /ˈtendə(r)/

    pagpapaligsahan ng kontrata, alok sa kontrata

    a formal process in which companies compete by submitting offers to supply goods or services, or the offer itself

    We won the tender to supply computers to all city schools.

    Napanalunan namin ang kontrata para magsuplay ng mga computer sa lahat ng paaralan ng lungsod.

    The tender documents must be submitted before 5 p.m. on Friday.

  4. 4

    liquidated damages(noun)

    /ˌlɪkwɪdeɪtɪd ˈdæmɪdʒɪz/

    itinakdang danyos, paunang takdang danyos

    a fixed amount agreed in the contract that one party must pay for a specific breach, such as late completion

    The contractor must pay liquidated damages of 0.1 percent for each day of delay.

    Kailangang magbayad ang kontratista ng itinakdang danyos na 0.1 porsiyento para sa bawat araw ng pagkaantala.

    Liquidated damages save the parties from proving the actual loss in court.

  5. 5

    handover(noun)

    /ˈhændəʊvə(r)/

    paglilipat ng gawain, pagpapasa ng trabaho

    passing your tasks, documents and information to a colleague before you leave a job

    Please prepare a handover document for your replacement before your last day.

    Mangyaring maghanda ng dokumento sa paglilipat ng gawain para sa papalit sa iyo bago ang huling araw mo.

    The handover took two weeks because he managed many client accounts.

  6. 6

    bill of quantities(noun)

    /ˌbɪl əv ˈkwɒntətiz/

    talaan ng dami ng gawain, BOQ

    a document listing every item of work with its measured quantity, which contractors price when they tender

    The bill of quantities was issued with the tender drawings.

    Inilabas ang talaan ng dami ng gawain kasama ng mga plano para sa bidding.

    Our quantity surveyor found missing items in the bill of quantities.

  7. 7

    cost estimate(noun)

    /ˈkɒst ˌestɪmət/

    pagtatantiya ng gastos, estimasyon ng gastos

    a calculation of how much a construction project or part of it is likely to cost

    The preliminary cost estimate for the factory is 80 billion dong.

    Ang paunang pagtatantiya ng gastos para sa pabrika ay 80 bilyong dong.

    The cost estimate must be updated after the design changes.

  8. 8

    unit rate(noun)

    /ˈjuːnɪt ˌreɪt/

    presyo kada yunit, halaga kada yunit

    the price for one unit of an item of work, such as one cubic metre of concrete, including labour, materials and plant

    The unit rate for plastering includes scaffolding and cleaning.

    Kasama sa presyo kada yunit ng pagpaplaster ang mga tayuan at paglilinis.

    New work is valued using the unit rates in the contract.

  9. 9

    variation order(noun)

    /ˌveəriˈeɪʃn ˌɔːdə(r)/

    utos ng pagbabago sa kontrata

    a written instruction from the client that changes the work in the contract, often changing the price or time

    The extra basement level was added by a variation order.

    Idinagdag ang karagdagang antas ng basement sa pamamagitan ng utos ng pagbabago.

    Do not start any extra work without a signed variation order.

  10. 10

    progress payment(noun)

    /ˈprəʊɡres ˌpeɪmənt/

    bayad ayon sa progreso ng gawain

    a payment made to the contractor at regular stages, based on the value of the work completed so far

    The contractor submits a claim for the progress payment at the end of each month.

    Nagsusumite ang kontratista ng paniningil para sa bayad ayon sa progreso sa katapusan ng bawat buwan.

    The progress payment was delayed because the measurements were not agreed.

  11. 11

    retention money(noun)

    /rɪˈtenʃn ˌmʌni/

    retensyon, perang pinipigil bilang garantiya

    a percentage of each payment kept back by the client until the contractor has fixed all defects

    Five percent of each payment is held as retention money.

    Limang porsiyento ng bawat bayad ay pinipigil bilang retensyon.

    Half of the retention money is released at handover.

  12. 12

    extension of time(noun)

    /ɪkˌstenʃn əv ˈtaɪm/

    pagpapalawig ng panahon ng kontrata, dagdag na araw

    extra time added to the contract completion date because of delays the contractor is not responsible for

    We claimed an extension of time because of the late design changes.

    Humingi kami ng pagpapalawig ng panahon dahil sa mga huling pagbabago sa disenyo.

    Three weeks of extension of time were granted for the flooding.

  13. 13

    critical path(noun)

    /ˌkrɪtɪkl ˈpɑːθ/

    kritikal na landas

    the longest chain of linked activities in a schedule, where any delay will delay the completion of the whole project

    The basement works are on the critical path, so they cannot slip.

    Nasa kritikal na landas ang mga gawain sa basement, kaya hindi sila puwedeng maantala.

    Late delivery of the lifts has moved them onto the critical path.

  14. 14

    acceptance(noun)

    /əkˈseptəns/

    pormal na pagtanggap ng gawain, pagsang-ayon sa gawain

    the formal check and approval of completed work by the client or consultant, confirming that it meets the contract

    The acceptance of the foundation works was signed by all parties.

    Nilagdaan ng lahat ng panig ang pagtanggap sa gawaing pundasyon.

    Request acceptance of the rebar before you close the formwork.

  15. 15

    non-conformance report(noun)

    /ˌnɒn kənˈfɔːməns rɪˌpɔːt/

    ulat ng hindi pagsunod sa espesipikasyon, NCR

    a formal record that some work or material does not meet the drawings or specification and must be corrected

    The consultant issued a non-conformance report for the wrong concrete grade.

    Naglabas ang konsultant ng ulat ng hindi pagsunod dahil sa maling grado ng kongkreto.

    Every non-conformance report must be closed before the final inspection.

  16. 16

    punch list(noun)

    /ˈpʌntʃ ˌlɪst/

    talaan ng natitirang gawain at depekto

    a list of small unfinished items and defects that must be completed before the project is fully accepted

    The punch list for the lobby has forty items, mostly paint touch-ups.

    Apatnapung aytem ang nasa talaan ng natitirang gawain para sa lobby, karamihan ay pagre-retouch ng pintura.

    We walked through each apartment with the client to make the punch list.

  17. 17

    practical completion(noun)

    /ˌpræktɪkl kəmˈpliːʃn/

    praktikal na pagkatapos ng gawain

    the stage when the works are finished enough for the client to use the building, with only minor items left

    Practical completion is planned for the end of June.

    Nakaplano ang praktikal na pagkatapos ng gawain sa katapusan ng Hunyo.

    The defects liability period starts from the date of practical completion.

  18. 18

    defects liability period(noun)

    /dɪˌfekts laɪəˈbɪləti ˌpɪəriəd/

    panahon ng pananagutan sa depekto, panahon ng garantiya

    a fixed period after completion, often one or two years, when the contractor must repair any defects that appear

    The defects liability period for this project is twenty-four months.

    Dalawampu't apat na buwan ang panahon ng pananagutan sa depekto ng proyektong ito.

    A pipe leaked during the defects liability period, so the contractor repaired it free of charge.

  19. 19

    final account(noun)

    /ˌfaɪnl əˈkaʊnt/

    pinal na pagtutuos ng kontrata

    the agreed final statement of the total contract value, including all variations and deductions, at the end of a project

    It took six months to agree the final account with the subcontractor.

    Inabot ng anim na buwan bago napagkasunduan ang pinal na pagtutuos sa subkontraktor.

    All variations must be included in the final account.