Contracts, acceptance and handover

Kontrak, penerimaan dan serah milik

  1. 1

    defect(noun)

    /ˈdiːfekt/

    kecacatan, kecacatan kerja

    a fault in completed work, such as a crack, leak or wrong finish, that the contractor must repair

    The contractor must rectify any defect found during the warranty period.

    Kontraktor mesti membaiki sebarang kecacatan yang ditemui dalam tempoh waranti.

    Water stains on the ceiling showed a defect in the roof waterproofing.

    Sinonimflawfaultblemishimperfectionweaknesserrorfailingshortcoming
    Antonimperfectionflawlessnesscorrectnessexcellence
  2. 2

    milestone(noun)

    /ˈmaɪlstəʊn/

    pencapaian penting, kejayaan utama, milestone

    an important point or stage in a project, often used to check progress

    Finishing the beta version is the next major milestone.

    Menyiapkan versi beta ialah pencapaian penting yang seterusnya.

    The client pays 30 percent at each project milestone.

    Sinonimlandmarkwatershedbenchmarkturning pointkey event
    Antonimsetbackregressionfailure
  3. 3

    tender(noun)

    /ˈtendə(r)/

    tender, dokumen tender

    a formal process in which companies compete by submitting offers to supply goods or services, or the offer itself

    We won the tender to supply computers to all city schools.

    Kami memenangi tender untuk membekalkan komputer kepada semua sekolah di bandar itu.

    The tender documents must be submitted before 5 p.m. on Friday.

  4. 4

    liquidated damages(noun)

    /ˌlɪkwɪdeɪtɪd ˈdæmɪdʒɪz/

    ganti rugi tertentu, ganti rugi yang ditetapkan

    a fixed amount agreed in the contract that one party must pay for a specific breach, such as late completion

    The contractor must pay liquidated damages of 0.1 percent for each day of delay.

    Kontraktor mesti membayar ganti rugi tertentu sebanyak 0.1 peratus bagi setiap hari kelewatan.

    Liquidated damages save the parties from proving the actual loss in court.

  5. 5

    handover(noun)

    /ˈhændəʊvə(r)/

    serah tugas, penyerahan tugas

    passing your tasks, documents and information to a colleague before you leave a job

    Please prepare a handover document for your replacement before your last day.

    Sila sediakan dokumen serah tugas untuk pengganti anda sebelum hari terakhir anda.

    The handover took two weeks because he managed many client accounts.

  6. 6

    bill of quantities(noun)

    /ˌbɪl əv ˈkwɒntətiz/

    Bil Kuantiti, BQ

    a document listing every item of work with its measured quantity, which contractors price when they tender

    The bill of quantities was issued with the tender drawings.

    Bil Kuantiti dikeluarkan bersama lukisan tender.

    Our quantity surveyor found missing items in the bill of quantities.

  7. 7

    cost estimate(noun)

    /ˈkɒst ˌestɪmət/

    anggaran kos

    a calculation of how much a construction project or part of it is likely to cost

    The preliminary cost estimate for the factory is 80 billion dong.

    Anggaran kos awal untuk kilang itu ialah 80 bilion dong.

    The cost estimate must be updated after the design changes.

  8. 8

    unit rate(noun)

    /ˈjuːnɪt ˌreɪt/

    kadar seunit, harga seunit

    the price for one unit of an item of work, such as one cubic metre of concrete, including labour, materials and plant

    The unit rate for plastering includes scaffolding and cleaning.

    Kadar seunit kerja pelesteran termasuk perancah dan kerja pembersihan.

    New work is valued using the unit rates in the contract.

  9. 9

    variation order(noun)

    /ˌveəriˈeɪʃn ˌɔːdə(r)/

    perintah perubahan, arahan perubahan kerja, VO

    a written instruction from the client that changes the work in the contract, often changing the price or time

    The extra basement level was added by a variation order.

    Tingkat bawah tanah tambahan itu ditambah melalui perintah perubahan.

    Do not start any extra work without a signed variation order.

  10. 10

    progress payment(noun)

    /ˈprəʊɡres ˌpeɪmənt/

    bayaran kemajuan, bayaran interim

    a payment made to the contractor at regular stages, based on the value of the work completed so far

    The contractor submits a claim for the progress payment at the end of each month.

    Kontraktor mengemukakan tuntutan bayaran kemajuan pada penghujung setiap bulan.

    The progress payment was delayed because the measurements were not agreed.

  11. 11

    retention money(noun)

    /rɪˈtenʃn ˌmʌni/

    wang tahanan

    a percentage of each payment kept back by the client until the contractor has fixed all defects

    Five percent of each payment is held as retention money.

    Lima peratus daripada setiap bayaran ditahan sebagai wang tahanan.

    Half of the retention money is released at handover.

  12. 12

    extension of time(noun)

    /ɪkˌstenʃn əv ˈtaɪm/

    lanjutan masa, EOT

    extra time added to the contract completion date because of delays the contractor is not responsible for

    We claimed an extension of time because of the late design changes.

    Kami menuntut lanjutan masa kerana perubahan reka bentuk yang lewat.

    Three weeks of extension of time were granted for the flooding.

  13. 13

    critical path(noun)

    /ˌkrɪtɪkl ˈpɑːθ/

    laluan kritikal

    the longest chain of linked activities in a schedule, where any delay will delay the completion of the whole project

    The basement works are on the critical path, so they cannot slip.

    Kerja bawah tanah berada pada laluan kritikal, maka tidak boleh dilewatkan.

    Late delivery of the lifts has moved them onto the critical path.

  14. 14

    acceptance(noun)

    /əkˈseptəns/

    penerimaan kerja, pengesahan penerimaan

    the formal check and approval of completed work by the client or consultant, confirming that it meets the contract

    The acceptance of the foundation works was signed by all parties.

    Penerimaan kerja asas ditandatangani oleh semua pihak.

    Request acceptance of the rebar before you close the formwork.

  15. 15

    non-conformance report(noun)

    /ˌnɒn kənˈfɔːməns rɪˌpɔːt/

    laporan ketidakakuran, NCR

    a formal record that some work or material does not meet the drawings or specification and must be corrected

    The consultant issued a non-conformance report for the wrong concrete grade.

    Perunding mengeluarkan laporan ketidakakuran kerana gred konkrit yang salah.

    Every non-conformance report must be closed before the final inspection.

  16. 16

    punch list(noun)

    /ˈpʌntʃ ˌlɪst/

    senarai kerja tertunggak, senarai kecacatan

    a list of small unfinished items and defects that must be completed before the project is fully accepted

    The punch list for the lobby has forty items, mostly paint touch-ups.

    Senarai kerja tertunggak untuk lobi mempunyai empat puluh item, kebanyakannya sentuhan semula cat.

    We walked through each apartment with the client to make the punch list.

  17. 17

    practical completion(noun)

    /ˌpræktɪkl kəmˈpliːʃn/

    penyiapan praktikal, siap kerja praktikal

    the stage when the works are finished enough for the client to use the building, with only minor items left

    Practical completion is planned for the end of June.

    Penyiapan praktikal dirancang pada penghujung Jun.

    The defects liability period starts from the date of practical completion.

  18. 18

    defects liability period(noun)

    /dɪˌfekts laɪəˈbɪləti ˌpɪəriəd/

    tempoh tanggungan kecacatan, DLP

    a fixed period after completion, often one or two years, when the contractor must repair any defects that appear

    The defects liability period for this project is twenty-four months.

    Tempoh tanggungan kecacatan bagi projek ini ialah dua puluh empat bulan.

    A pipe leaked during the defects liability period, so the contractor repaired it free of charge.

  19. 19

    final account(noun)

    /ˌfaɪnl əˈkaʊnt/

    akaun akhir

    the agreed final statement of the total contract value, including all variations and deductions, at the end of a project

    It took six months to agree the final account with the subcontractor.

    Enam bulan diambil untuk bersetuju mengenai akaun akhir dengan subkontraktor.

    All variations must be included in the final account.