Contracts, acceptance and handover
Kontrak, penerimaan dan serah milik
kecacatan, kecacatan kerja
a fault in completed work, such as a crack, leak or wrong finish, that the contractor must repair
The contractor must rectify any defect found during the warranty period.
Kontraktor mesti membaiki sebarang kecacatan yang ditemui dalam tempoh waranti.
Water stains on the ceiling showed a defect in the roof waterproofing.
SinonimflawfaultblemishimperfectionweaknesserrorfailingshortcomingAntonimperfectionflawlessnesscorrectnessexcellencepencapaian penting, kejayaan utama, milestone
an important point or stage in a project, often used to check progress
Finishing the beta version is the next major milestone.
Menyiapkan versi beta ialah pencapaian penting yang seterusnya.
The client pays 30 percent at each project milestone.
Sinonimlandmarkwatershedbenchmarkturning pointkey eventAntonimsetbackregressionfailuretender, dokumen tender
a formal process in which companies compete by submitting offers to supply goods or services, or the offer itself
We won the tender to supply computers to all city schools.
Kami memenangi tender untuk membekalkan komputer kepada semua sekolah di bandar itu.
The tender documents must be submitted before 5 p.m. on Friday.
ganti rugi tertentu, ganti rugi yang ditetapkan
a fixed amount agreed in the contract that one party must pay for a specific breach, such as late completion
The contractor must pay liquidated damages of 0.1 percent for each day of delay.
Kontraktor mesti membayar ganti rugi tertentu sebanyak 0.1 peratus bagi setiap hari kelewatan.
Liquidated damages save the parties from proving the actual loss in court.
serah tugas, penyerahan tugas
passing your tasks, documents and information to a colleague before you leave a job
Please prepare a handover document for your replacement before your last day.
Sila sediakan dokumen serah tugas untuk pengganti anda sebelum hari terakhir anda.
The handover took two weeks because he managed many client accounts.
Bil Kuantiti, BQ
a document listing every item of work with its measured quantity, which contractors price when they tender
The bill of quantities was issued with the tender drawings.
Bil Kuantiti dikeluarkan bersama lukisan tender.
Our quantity surveyor found missing items in the bill of quantities.
anggaran kos
a calculation of how much a construction project or part of it is likely to cost
The preliminary cost estimate for the factory is 80 billion dong.
Anggaran kos awal untuk kilang itu ialah 80 bilion dong.
The cost estimate must be updated after the design changes.
kadar seunit, harga seunit
the price for one unit of an item of work, such as one cubic metre of concrete, including labour, materials and plant
The unit rate for plastering includes scaffolding and cleaning.
Kadar seunit kerja pelesteran termasuk perancah dan kerja pembersihan.
New work is valued using the unit rates in the contract.
perintah perubahan, arahan perubahan kerja, VO
a written instruction from the client that changes the work in the contract, often changing the price or time
The extra basement level was added by a variation order.
Tingkat bawah tanah tambahan itu ditambah melalui perintah perubahan.
Do not start any extra work without a signed variation order.
bayaran kemajuan, bayaran interim
a payment made to the contractor at regular stages, based on the value of the work completed so far
The contractor submits a claim for the progress payment at the end of each month.
Kontraktor mengemukakan tuntutan bayaran kemajuan pada penghujung setiap bulan.
The progress payment was delayed because the measurements were not agreed.
wang tahanan
a percentage of each payment kept back by the client until the contractor has fixed all defects
Five percent of each payment is held as retention money.
Lima peratus daripada setiap bayaran ditahan sebagai wang tahanan.
Half of the retention money is released at handover.
lanjutan masa, EOT
extra time added to the contract completion date because of delays the contractor is not responsible for
We claimed an extension of time because of the late design changes.
Kami menuntut lanjutan masa kerana perubahan reka bentuk yang lewat.
Three weeks of extension of time were granted for the flooding.
laluan kritikal
the longest chain of linked activities in a schedule, where any delay will delay the completion of the whole project
The basement works are on the critical path, so they cannot slip.
Kerja bawah tanah berada pada laluan kritikal, maka tidak boleh dilewatkan.
Late delivery of the lifts has moved them onto the critical path.
penerimaan kerja, pengesahan penerimaan
the formal check and approval of completed work by the client or consultant, confirming that it meets the contract
The acceptance of the foundation works was signed by all parties.
Penerimaan kerja asas ditandatangani oleh semua pihak.
Request acceptance of the rebar before you close the formwork.
laporan ketidakakuran, NCR
a formal record that some work or material does not meet the drawings or specification and must be corrected
The consultant issued a non-conformance report for the wrong concrete grade.
Perunding mengeluarkan laporan ketidakakuran kerana gred konkrit yang salah.
Every non-conformance report must be closed before the final inspection.
senarai kerja tertunggak, senarai kecacatan
a list of small unfinished items and defects that must be completed before the project is fully accepted
The punch list for the lobby has forty items, mostly paint touch-ups.
Senarai kerja tertunggak untuk lobi mempunyai empat puluh item, kebanyakannya sentuhan semula cat.
We walked through each apartment with the client to make the punch list.
penyiapan praktikal, siap kerja praktikal
the stage when the works are finished enough for the client to use the building, with only minor items left
Practical completion is planned for the end of June.
Penyiapan praktikal dirancang pada penghujung Jun.
The defects liability period starts from the date of practical completion.
tempoh tanggungan kecacatan, DLP
a fixed period after completion, often one or two years, when the contractor must repair any defects that appear
The defects liability period for this project is twenty-four months.
Tempoh tanggungan kecacatan bagi projek ini ialah dua puluh empat bulan.
A pipe leaked during the defects liability period, so the contractor repaired it free of charge.
akaun akhir
the agreed final statement of the total contract value, including all variations and deductions, at the end of a project
It took six months to agree the final account with the subcontractor.
Enam bulan diambil untuk bersetuju mengenai akaun akhir dengan subkontraktor.
All variations must be included in the final account.