第 10/10 課 · 19 個單字 · 已學會 0 個
Contracts, acceptance and handover
合約、驗收與交付
瑕疵, 缺失, 缺陷
a fault in completed work, such as a crack, leak or wrong finish, that the contractor must repair
The contractor must rectify any defect found during the warranty period.
承包商必須修復保固期間內發現的任何瑕疵。
Water stains on the ceiling showed a defect in the roof waterproofing.
同義詞flawfaultblemishimperfectionweaknesserrorfailingshortcoming反義詞perfectionflawlessnesscorrectnessexcellence里程碑
an important point or stage in a project, often used to check progress
Finishing the beta version is the next major milestone.
完成測試版是下一個重要的里程碑。
The client pays 30 percent at each project milestone.
同義詞landmarkwatershedbenchmarkturning pointkey event反義詞setbackregressionfailure預定違約金, 約定損害賠償額
a fixed amount agreed in the contract that one party must pay for a specific breach, such as late completion
The contractor must pay liquidated damages of 0.1 percent for each day of delay.
承包商須按每延遲一日支付百分之0.1的預定違約金。
Liquidated damages save the parties from proving the actual loss in court.
數量清單, 工程數量表, 標單
a document listing every item of work with its measured quantity, which contractors price when they tender
The bill of quantities was issued with the tender drawings.
數量清單連同招標圖面一併發出。
Our quantity surveyor found missing items in the bill of quantities.
變更指示, 變更設計通知, 追加減工程指令
a written instruction from the client that changes the work in the contract, often changing the price or time
The extra basement level was added by a variation order.
多增加的一層地下室是透過變更指示加入的。
Do not start any extra work without a signed variation order.
工程進度款, 計價款, 分期付款
a payment made to the contractor at regular stages, based on the value of the work completed so far
The contractor submits a claim for the progress payment at the end of each month.
承包商於每月底提出進度款請款。
The progress payment was delayed because the measurements were not agreed.
工期展延, 展延工期
extra time added to the contract completion date because of delays the contractor is not responsible for
We claimed an extension of time because of the late design changes.
由於設計變更太晚提出,我們申請了工期展延。
Three weeks of extension of time were granted for the flooding.
要徑, 要徑路線, 要徑法關鍵路徑
the longest chain of linked activities in a schedule, where any delay will delay the completion of the whole project
The basement works are on the critical path, so they cannot slip.
地下室工程位於要徑上,因此不能延誤。
Late delivery of the lifts has moved them onto the critical path.
缺失報告, 不符合報告, 不合格報告
a formal record that some work or material does not meet the drawings or specification and must be corrected
The consultant issued a non-conformance report for the wrong concrete grade.
由於混凝土強度等級用錯,顧問開立了不符合報告。
Every non-conformance report must be closed before the final inspection.
缺失清單, 待改善清單, 瑕疵清單
a list of small unfinished items and defects that must be completed before the project is fully accepted
The punch list for the lobby has forty items, mostly paint touch-ups.
大廳的缺失清單有四十個項目,大多是油漆補修。
We walked through each apartment with the client to make the punch list.
實質完工, 竣工, 實質竣工
the stage when the works are finished enough for the client to use the building, with only minor items left
Practical completion is planned for the end of June.
實質完工預定於六月底。
The defects liability period starts from the date of practical completion.
保固期, 瑕疵擔保期
a fixed period after completion, often one or two years, when the contractor must repair any defects that appear
The defects liability period for this project is twenty-four months.
本專案的保固期為二十四個月。
A pipe leaked during the defects liability period, so the contractor repaired it free of charge.
最終結算, 竣工結算, 決算
the agreed final statement of the total contract value, including all variations and deductions, at the end of a project
It took six months to agree the final account with the subcontractor.
與分包商談妥最終結算花了六個月。
All variations must be included in the final account.