Contracts, acceptance and handover

Kontrak, serah terima pekerjaan, dan penyerahan akhir

  1. 1

    defect(noun)

    /ˈdiːfekt/

    cacat, cacat pekerjaan

    a fault in completed work, such as a crack, leak or wrong finish, that the contractor must repair

    The contractor must rectify any defect found during the warranty period.

    Kontraktor wajib memperbaiki setiap cacat yang ditemukan selama masa garansi.

    Water stains on the ceiling showed a defect in the roof waterproofing.

    Sinonimflawfaultblemishimperfectionweaknesserrorfailingshortcoming
    Antonimperfectionflawlessnesscorrectnessexcellence
  2. 2

    milestone(noun)

    /ˈmaɪlstəʊn/

    tonggak proyek, tonggak pencapaian

    an important point or stage in a project, often used to check progress

    Finishing the beta version is the next major milestone.

    Menyelesaikan versi beta adalah tonggak utama berikutnya.

    The client pays 30 percent at each project milestone.

    Sinonimlandmarkwatershedbenchmarkturning pointkey event
    Antonimsetbackregressionfailure
  3. 3

    tender(noun)

    /ˈtendə(r)/

    tender, penawaran tender

    a formal process in which companies compete by submitting offers to supply goods or services, or the offer itself

    We won the tender to supply computers to all city schools.

    Kami memenangkan tender pengadaan komputer untuk seluruh sekolah di kota.

    The tender documents must be submitted before 5 p.m. on Friday.

  4. 4

    liquidated damages(noun)

    /ˌlɪkwɪdeɪtɪd ˈdæmɪdʒɪz/

    ganti rugi likuidasi, ganti rugi yang ditetapkan di muka

    a fixed amount agreed in the contract that one party must pay for a specific breach, such as late completion

    The contractor must pay liquidated damages of 0.1 percent for each day of delay.

    Kontraktor harus membayar ganti rugi likuidasi sebesar 0,1 persen untuk setiap hari keterlambatan.

    Liquidated damages save the parties from proving the actual loss in court.

  5. 5

    handover(noun)

    /ˈhændəʊvə(r)/

    serah terima pekerjaan, alih tugas

    passing your tasks, documents and information to a colleague before you leave a job

    Please prepare a handover document for your replacement before your last day.

    Mohon siapkan dokumen serah terima untuk pengganti Anda sebelum hari terakhir Anda.

    The handover took two weeks because he managed many client accounts.

  6. 6

    bill of quantities(noun)

    /ˌbɪl əv ˈkwɒntətiz/

    daftar volume pekerjaan, BQ

    a document listing every item of work with its measured quantity, which contractors price when they tender

    The bill of quantities was issued with the tender drawings.

    Daftar volume pekerjaan diterbitkan bersama gambar tender.

    Our quantity surveyor found missing items in the bill of quantities.

  7. 7

    cost estimate(noun)

    /ˈkɒst ˌestɪmət/

    perkiraan biaya, estimasi biaya

    a calculation of how much a construction project or part of it is likely to cost

    The preliminary cost estimate for the factory is 80 billion dong.

    Perkiraan biaya awal untuk pabrik tersebut adalah 80 miliar dong.

    The cost estimate must be updated after the design changes.

  8. 8

    unit rate(noun)

    /ˈjuːnɪt ˌreɪt/

    harga satuan, harga satuan pekerjaan

    the price for one unit of an item of work, such as one cubic metre of concrete, including labour, materials and plant

    The unit rate for plastering includes scaffolding and cleaning.

    Harga satuan pekerjaan plesteran sudah termasuk perancah dan pembersihan.

    New work is valued using the unit rates in the contract.

  9. 9

    variation order(noun)

    /ˌveəriˈeɪʃn ˌɔːdə(r)/

    perintah perubahan pekerjaan, variation order

    a written instruction from the client that changes the work in the contract, often changing the price or time

    The extra basement level was added by a variation order.

    Tingkat basemen tambahan ditambahkan melalui perintah perubahan pekerjaan.

    Do not start any extra work without a signed variation order.

  10. 10

    progress payment(noun)

    /ˈprəʊɡres ˌpeɪmənt/

    pembayaran termin, pembayaran bertahap

    a payment made to the contractor at regular stages, based on the value of the work completed so far

    The contractor submits a claim for the progress payment at the end of each month.

    Kontraktor mengajukan tagihan pembayaran termin pada akhir setiap bulan.

    The progress payment was delayed because the measurements were not agreed.

  11. 11

    retention money(noun)

    /rɪˈtenʃn ˌmʌni/

    uang retensi, dana jaminan pemeliharaan

    a percentage of each payment kept back by the client until the contractor has fixed all defects

    Five percent of each payment is held as retention money.

    Lima persen dari setiap pembayaran ditahan sebagai uang retensi.

    Half of the retention money is released at handover.

  12. 12

    extension of time(noun)

    /ɪkˌstenʃn əv ˈtaɪm/

    perpanjangan waktu pelaksanaan

    extra time added to the contract completion date because of delays the contractor is not responsible for

    We claimed an extension of time because of the late design changes.

    Kami mengajukan perpanjangan waktu pelaksanaan karena perubahan desain yang terlambat.

    Three weeks of extension of time were granted for the flooding.

  13. 13

    critical path(noun)

    /ˌkrɪtɪkl ˈpɑːθ/

    lintasan kritis, jalur kritis

    the longest chain of linked activities in a schedule, where any delay will delay the completion of the whole project

    The basement works are on the critical path, so they cannot slip.

    Pekerjaan basemen berada pada lintasan kritis, sehingga tidak boleh mundur.

    Late delivery of the lifts has moved them onto the critical path.

  14. 14

    acceptance(noun)

    /əkˈseptəns/

    serah terima pekerjaan, pemeriksaan dan penerimaan pekerjaan

    the formal check and approval of completed work by the client or consultant, confirming that it meets the contract

    The acceptance of the foundation works was signed by all parties.

    Berita acara penerimaan pekerjaan pondasi ditandatangani oleh semua pihak.

    Request acceptance of the rebar before you close the formwork.

  15. 15

    non-conformance report(noun)

    /ˌnɒn kənˈfɔːməns rɪˌpɔːt/

    laporan ketidaksesuaian, NCR

    a formal record that some work or material does not meet the drawings or specification and must be corrected

    The consultant issued a non-conformance report for the wrong concrete grade.

    Konsultan menerbitkan laporan ketidaksesuaian karena mutu beton yang salah.

    Every non-conformance report must be closed before the final inspection.

  16. 16

    punch list(noun)

    /ˈpʌntʃ ˌlɪst/

    daftar pekerjaan sisa, punch list

    a list of small unfinished items and defects that must be completed before the project is fully accepted

    The punch list for the lobby has forty items, mostly paint touch-ups.

    Daftar pekerjaan sisa untuk lobi berisi empat puluh item, kebanyakan perbaikan cat.

    We walked through each apartment with the client to make the punch list.

  17. 17

    practical completion(noun)

    /ˌpræktɪkl kəmˈpliːʃn/

    penyelesaian pekerjaan secara fisik, serah terima pertama

    the stage when the works are finished enough for the client to use the building, with only minor items left

    Practical completion is planned for the end of June.

    Penyelesaian pekerjaan secara fisik direncanakan pada akhir Juni.

    The defects liability period starts from the date of practical completion.

  18. 18

    defects liability period(noun)

    /dɪˌfekts laɪəˈbɪləti ˌpɪəriəd/

    masa pemeliharaan, masa tanggung gugat cacat mutu

    a fixed period after completion, often one or two years, when the contractor must repair any defects that appear

    The defects liability period for this project is twenty-four months.

    Masa pemeliharaan untuk proyek ini adalah dua puluh empat bulan.

    A pipe leaked during the defects liability period, so the contractor repaired it free of charge.

  19. 19

    final account(noun)

    /ˌfaɪnl əˈkaʊnt/

    perhitungan akhir kontrak, penyelesaian akhir biaya

    the agreed final statement of the total contract value, including all variations and deductions, at the end of a project

    It took six months to agree the final account with the subcontractor.

    Dibutuhkan enam bulan untuk menyepakati perhitungan akhir kontrak dengan subkontraktor.

    All variations must be included in the final account.