Contracts, acceptance and handover

Contratos, recebimento e entrega da obra

  1. 1

    defect(noun)

    /ˈdiːfekt/

    defeito, vício de construção

    a fault in completed work, such as a crack, leak or wrong finish, that the contractor must repair

    The contractor must rectify any defect found during the warranty period.

    O empreiteiro deve corrigir qualquer defeito encontrado durante o período de garantia.

    Water stains on the ceiling showed a defect in the roof waterproofing.

    Sinônimosflawfaultblemishimperfectionweaknesserrorfailingshortcoming
    Antônimosperfectionflawlessnesscorrectnessexcellence
  2. 2

    milestone(noun)

    /ˈmaɪlstəʊn/

    marco, marco do projeto, milestone

    an important point or stage in a project, often used to check progress

    Finishing the beta version is the next major milestone.

    Concluir a versão beta é o próximo grande marco.

    The client pays 30 percent at each project milestone.

    Sinônimoslandmarkwatershedbenchmarkturning pointkey event
    Antônimossetbackregressionfailure
  3. 3

    tender(noun)

    /ˈtendə(r)/

    licitação, proposta de licitação, concorrência

    a formal process in which companies compete by submitting offers to supply goods or services, or the offer itself

    We won the tender to supply computers to all city schools.

    Ganhamos a licitação para fornecer computadores a todas as escolas da cidade.

    The tender documents must be submitted before 5 p.m. on Friday.

  4. 4

    liquidated damages(noun)

    /ˌlɪkwɪdeɪtɪd ˈdæmɪdʒɪz/

    cláusula penal, multa contratual

    a fixed amount agreed in the contract that one party must pay for a specific breach, such as late completion

    The contractor must pay liquidated damages of 0.1 percent for each day of delay.

    A contratada deve pagar multa contratual de 0,1% por dia de atraso.

    Liquidated damages save the parties from proving the actual loss in court.

  5. 5

    handover(noun)

    /ˈhændəʊvə(r)/

    repasse de atividades, transição de funções

    passing your tasks, documents and information to a colleague before you leave a job

    Please prepare a handover document for your replacement before your last day.

    Por favor, prepare um documento de repasse para o seu substituto antes do seu último dia.

    The handover took two weeks because he managed many client accounts.

  6. 6

    bill of quantities(noun)

    /ˌbɪl əv ˈkwɒntətiz/

    planilha de quantitativos, lista de quantidades

    a document listing every item of work with its measured quantity, which contractors price when they tender

    The bill of quantities was issued with the tender drawings.

    A planilha de quantitativos foi emitida junto com os desenhos da licitação.

    Our quantity surveyor found missing items in the bill of quantities.

  7. 7

    cost estimate(noun)

    /ˈkɒst ˌestɪmət/

    orçamento de obra, estimativa de custos

    a calculation of how much a construction project or part of it is likely to cost

    The preliminary cost estimate for the factory is 80 billion dong.

    A estimativa preliminar de custos da fábrica é de 80 bilhões de dong.

    The cost estimate must be updated after the design changes.

  8. 8

    unit rate(noun)

    /ˈjuːnɪt ˌreɪt/

    preço unitário, custo unitário

    the price for one unit of an item of work, such as one cubic metre of concrete, including labour, materials and plant

    The unit rate for plastering includes scaffolding and cleaning.

    O preço unitário do reboco inclui andaimes e limpeza.

    New work is valued using the unit rates in the contract.

  9. 9

    variation order(noun)

    /ˌveəriˈeɪʃn ˌɔːdə(r)/

    ordem de alteração, aditivo contratual

    a written instruction from the client that changes the work in the contract, often changing the price or time

    The extra basement level was added by a variation order.

    O nível extra de subsolo foi incluído por meio de uma ordem de alteração.

    Do not start any extra work without a signed variation order.

  10. 10

    progress payment(noun)

    /ˈprəʊɡres ˌpeɪmənt/

    medição, pagamento parcial, pagamento por etapa

    a payment made to the contractor at regular stages, based on the value of the work completed so far

    The contractor submits a claim for the progress payment at the end of each month.

    O construtor apresenta o pedido de medição para pagamento no final de cada mês.

    The progress payment was delayed because the measurements were not agreed.

  11. 11

    retention money(noun)

    /rɪˈtenʃn ˌmʌni/

    retenção contratual, caução de garantia, retenção

    a percentage of each payment kept back by the client until the contractor has fixed all defects

    Five percent of each payment is held as retention money.

    Cinco por cento de cada pagamento é retido como retenção contratual.

    Half of the retention money is released at handover.

  12. 12

    extension of time(noun)

    /ɪkˌstenʃn əv ˈtaɪm/

    prorrogação de prazo, aditivo de prazo

    extra time added to the contract completion date because of delays the contractor is not responsible for

    We claimed an extension of time because of the late design changes.

    Solicitamos prorrogação de prazo por causa das alterações tardias no projeto.

    Three weeks of extension of time were granted for the flooding.

  13. 13

    critical path(noun)

    /ˌkrɪtɪkl ˈpɑːθ/

    caminho crítico

    the longest chain of linked activities in a schedule, where any delay will delay the completion of the whole project

    The basement works are on the critical path, so they cannot slip.

    Os serviços do subsolo estão no caminho crítico, portanto não podem atrasar.

    Late delivery of the lifts has moved them onto the critical path.

  14. 14

    acceptance(noun)

    /əkˈseptəns/

    recebimento, aceitação, aprovação de serviço

    the formal check and approval of completed work by the client or consultant, confirming that it meets the contract

    The acceptance of the foundation works was signed by all parties.

    O recebimento dos serviços de fundação foi assinado por todas as partes.

    Request acceptance of the rebar before you close the formwork.

  15. 15

    non-conformance report(noun)

    /ˌnɒn kənˈfɔːməns rɪˌpɔːt/

    relatório de não conformidade, RNC

    a formal record that some work or material does not meet the drawings or specification and must be corrected

    The consultant issued a non-conformance report for the wrong concrete grade.

    O consultor emitiu um relatório de não conformidade por causa da classe de concreto incorreta.

    Every non-conformance report must be closed before the final inspection.

  16. 16

    punch list(noun)

    /ˈpʌntʃ ˌlɪst/

    lista de pendências, punch list

    a list of small unfinished items and defects that must be completed before the project is fully accepted

    The punch list for the lobby has forty items, mostly paint touch-ups.

    A lista de pendências do saguão tem quarenta itens, a maioria retoques de pintura.

    We walked through each apartment with the client to make the punch list.

  17. 17

    practical completion(noun)

    /ˌpræktɪkl kəmˈpliːʃn/

    conclusão substancial, recebimento provisório

    the stage when the works are finished enough for the client to use the building, with only minor items left

    Practical completion is planned for the end of June.

    A conclusão substancial está prevista para o fim de junho.

    The defects liability period starts from the date of practical completion.

  18. 18

    defects liability period(noun)

    /dɪˌfekts laɪəˈbɪləti ˌpɪəriəd/

    prazo de garantia, período de garantia da obra

    a fixed period after completion, often one or two years, when the contractor must repair any defects that appear

    The defects liability period for this project is twenty-four months.

    O prazo de garantia deste projeto é de vinte e quatro meses.

    A pipe leaked during the defects liability period, so the contractor repaired it free of charge.

  19. 19

    final account(noun)

    /ˌfaɪnl əˈkaʊnt/

    medição final, balanço final do contrato

    the agreed final statement of the total contract value, including all variations and deductions, at the end of a project

    It took six months to agree the final account with the subcontractor.

    Levamos seis meses para acordar a medição final com o subempreiteiro.

    All variations must be included in the final account.