Contracts, acceptance and handover

Sözleşmeler, kabul ve teslim

  1. 1

    defect(noun)

    /ˈdiːfekt/

    kusur, ayıp, hata

    a fault in completed work, such as a crack, leak or wrong finish, that the contractor must repair

    The contractor must rectify any defect found during the warranty period.

    Yüklenici, garanti süresi içinde tespit edilen her kusuru gidermek zorundadır.

    Water stains on the ceiling showed a defect in the roof waterproofing.

    Eş anlamlılarflawfaultblemishimperfectionweaknesserrorfailingshortcoming
    Zıt anlamlılarperfectionflawlessnesscorrectnessexcellence
  2. 2

    milestone(noun)

    /ˈmaɪlstəʊn/

    kilometre taşı, ara hedef

    an important point or stage in a project, often used to check progress

    Finishing the beta version is the next major milestone.

    Beta sürümünü tamamlamak bir sonraki önemli kilometre taşıdır.

    The client pays 30 percent at each project milestone.

    Eş anlamlılarlandmarkwatershedbenchmarkturning pointkey event
    Zıt anlamlılarsetbackregressionfailure
  3. 3

    tender(noun)

    /ˈtendə(r)/

    ihale, ihale teklifi

    a formal process in which companies compete by submitting offers to supply goods or services, or the offer itself

    We won the tender to supply computers to all city schools.

    Şehirdeki tüm okullara bilgisayar tedarik etme ihalesini kazandık.

    The tender documents must be submitted before 5 p.m. on Friday.

  4. 4

    liquidated damages(noun)

    /ˌlɪkwɪdeɪtɪd ˈdæmɪdʒɪz/

    götürü tazminat, cezai şart

    a fixed amount agreed in the contract that one party must pay for a specific breach, such as late completion

    The contractor must pay liquidated damages of 0.1 percent for each day of delay.

    Yüklenici, gecikilen her gün için yüzde 0,1 oranında götürü tazminat ödemek zorundadır.

    Liquidated damages save the parties from proving the actual loss in court.

  5. 5

    handover(noun)

    /ˈhændəʊvə(r)/

    devir teslim, iş devri

    passing your tasks, documents and information to a colleague before you leave a job

    Please prepare a handover document for your replacement before your last day.

    Lütfen son gününüzden önce yerinize gelecek kişi için bir devir teslim belgesi hazırlayın.

    The handover took two weeks because he managed many client accounts.

  6. 6

    bill of quantities(noun)

    /ˌbɪl əv ˈkwɒntətiz/

    metraj cetveli, iş kalemleri listesi

    a document listing every item of work with its measured quantity, which contractors price when they tender

    The bill of quantities was issued with the tender drawings.

    Metraj cetveli ihale çizimleriyle birlikte yayımlandı.

    Our quantity surveyor found missing items in the bill of quantities.

  7. 7

    cost estimate(noun)

    /ˈkɒst ˌestɪmət/

    maliyet tahmini, keşif bedeli

    a calculation of how much a construction project or part of it is likely to cost

    The preliminary cost estimate for the factory is 80 billion dong.

    Fabrikanın ön maliyet tahmini 80 milyar dong.

    The cost estimate must be updated after the design changes.

  8. 8

    unit rate(noun)

    /ˈjuːnɪt ˌreɪt/

    birim fiyat

    the price for one unit of an item of work, such as one cubic metre of concrete, including labour, materials and plant

    The unit rate for plastering includes scaffolding and cleaning.

    Sıva birim fiyatı iskele ve temizliği kapsar.

    New work is valued using the unit rates in the contract.

  9. 9

    variation order(noun)

    /ˌveəriˈeɪʃn ˌɔːdə(r)/

    değişiklik emri, değişiklik talimatı

    a written instruction from the client that changes the work in the contract, often changing the price or time

    The extra basement level was added by a variation order.

    İlave bodrum kat bir değişiklik emriyle eklendi.

    Do not start any extra work without a signed variation order.

  10. 10

    progress payment(noun)

    /ˈprəʊɡres ˌpeɪmənt/

    hakediş ödemesi, ara ödeme

    a payment made to the contractor at regular stages, based on the value of the work completed so far

    The contractor submits a claim for the progress payment at the end of each month.

    Yüklenici her ayın sonunda hakediş ödemesi için talep sunar.

    The progress payment was delayed because the measurements were not agreed.

  11. 11

    retention money(noun)

    /rɪˈtenʃn ˌmʌni/

    teminat kesintisi, hakediş teminatı

    a percentage of each payment kept back by the client until the contractor has fixed all defects

    Five percent of each payment is held as retention money.

    Her ödemenin yüzde beşi teminat kesintisi olarak tutulur.

    Half of the retention money is released at handover.

  12. 12

    extension of time(noun)

    /ɪkˌstenʃn əv ˈtaɪm/

    süre uzatımı

    extra time added to the contract completion date because of delays the contractor is not responsible for

    We claimed an extension of time because of the late design changes.

    Geç gelen tasarım değişiklikleri nedeniyle süre uzatımı talep ettik.

    Three weeks of extension of time were granted for the flooding.

  13. 13

    critical path(noun)

    /ˌkrɪtɪkl ˈpɑːθ/

    kritik yol

    the longest chain of linked activities in a schedule, where any delay will delay the completion of the whole project

    The basement works are on the critical path, so they cannot slip.

    Bodrum işleri kritik yol üzerinde olduğundan ertelenemez.

    Late delivery of the lifts has moved them onto the critical path.

  14. 14

    acceptance(noun)

    /əkˈseptəns/

    iş kabulü, kontrol ve kabul

    the formal check and approval of completed work by the client or consultant, confirming that it meets the contract

    The acceptance of the foundation works was signed by all parties.

    Temel işlerinin kabulü tüm taraflarca imzalandı.

    Request acceptance of the rebar before you close the formwork.

  15. 15

    non-conformance report(noun)

    /ˌnɒn kənˈfɔːməns rɪˌpɔːt/

    uygunsuzluk raporu, NCR

    a formal record that some work or material does not meet the drawings or specification and must be corrected

    The consultant issued a non-conformance report for the wrong concrete grade.

    Müşavir yanlış beton sınıfı nedeniyle bir uygunsuzluk raporu düzenledi.

    Every non-conformance report must be closed before the final inspection.

  16. 16

    punch list(noun)

    /ˈpʌntʃ ˌlɪst/

    eksik ve kusur listesi, eksik iş listesi

    a list of small unfinished items and defects that must be completed before the project is fully accepted

    The punch list for the lobby has forty items, mostly paint touch-ups.

    Lobi için hazırlanan eksik ve kusur listesinde çoğu boya rötuşu olan kırk kalem var.

    We walked through each apartment with the client to make the punch list.

  17. 17

    practical completion(noun)

    /ˌpræktɪkl kəmˈpliːʃn/

    geçici kabul

    the stage when the works are finished enough for the client to use the building, with only minor items left

    Practical completion is planned for the end of June.

    Geçici kabul haziran sonu için planlanıyor.

    The defects liability period starts from the date of practical completion.

  18. 18

    defects liability period(noun)

    /dɪˌfekts laɪəˈbɪləti ˌpɪəriəd/

    kusur sorumluluk süresi, garanti süresi

    a fixed period after completion, often one or two years, when the contractor must repair any defects that appear

    The defects liability period for this project is twenty-four months.

    Bu projede kusur sorumluluk süresi yirmi dört aydır.

    A pipe leaked during the defects liability period, so the contractor repaired it free of charge.

  19. 19

    final account(noun)

    /ˌfaɪnl əˈkaʊnt/

    kesin hesap, kesin hakediş

    the agreed final statement of the total contract value, including all variations and deductions, at the end of a project

    It took six months to agree the final account with the subcontractor.

    Taşeronla kesin hesap üzerinde anlaşmak altı ay sürdü.

    All variations must be included in the final account.