레슨 9/10 · 15단어 · 외운 단어 0
Measurement and fault finding
측정과 고장 탐지
교정하다, 보정하다
to check and adjust a measuring instrument so that its readings are accurate
All test instruments must be calibrated once a year.
모든 시험 계측기는 연 1회 교정해야 한다.
The pressure transmitter was calibrated before the system was started.
유의어adjusttunecorrectstandardizeset반의어unbalancemisadjustdistort오실로스코프, 파형 측정기
an instrument that shows how a voltage changes over time as a waveform on a screen
The oscilloscope showed noise on the encoder signal.
오실로스코프에서 엔코더 신호에 노이즈가 나타났다.
Use an isolated oscilloscope probe when measuring the drive output.
유의어scopewaveform monitor반의어N/A문제 해결하다, 트러블슈팅하다, 장애를 진단하고 해결하다
to find the cause of a technical problem and fix it, usually by checking possible causes one by one
The technician spent an hour troubleshooting the Wi-Fi in the meeting room.
기술자는 회의실 와이파이 문제를 해결하는 데 한 시간을 썼습니다.
Follow these steps to troubleshoot common login problems.
유의어diagnosefixresolvedebug반의어ignoreneglect절연저항계, 절연저항 측정기
an instrument that applies a high test voltage to measure how well cable or winding insulation prevents leakage
Test the motor with an insulation resistance tester at 500 volts.
절연저항계로 500볼트에서 모터를 시험하세요.
Disconnect the electronics before using the insulation resistance tester on the cable.
접지저항계, 접지저항 측정기
an instrument used to measure the resistance between an earth electrode and the surrounding ground
The earth resistance tester showed 2 ohms, which meets the requirement.
접지저항계가 2옴을 나타내 기준을 충족했다.
Drive the test spikes into the soil before using the earth resistance tester.
도통 시험, 통전 시험
a test that checks whether a conductor or circuit forms a complete path with no breaks
Do a continuity test on the earth conductor before energising the board.
배전반에 전원을 투입하기 전에 접지 도체의 도통 시험을 실시하세요.
The continuity test showed a broken wire inside the trailing cable.
시운전, 커미셔닝
the process of testing and checking new electrical equipment to prove it works correctly before handover
Commissioning of the new switchboard is planned for next Tuesday.
새 배전반의 시운전은 다음 주 화요일로 예정되어 있다.
All test results must be recorded in the commissioning report.